Misplaced Pages

Yamanote Line

Article snapshot taken from Wikipedia with creative commons attribution-sharealike license. Give it a read and then ask your questions in the chat. We can research this topic together.

The Yamanote Line ( Japanese : 山手線 , romanized :  Yamanote-sen ) is a loop service in Tokyo , Japan , operated by the East Japan Railway Company (JR East). It is one of Tokyo's busiest and most important lines, connecting most of Tokyo's major stations and urban centres, including Marunouchi , the Yūrakuchō / Ginza area, Shinagawa , Shibuya , Shinjuku , Ikebukuro , and Ueno , with all but two of its 30 stations connecting to other railway or underground (subway) lines.

#148851

39-573: Internally JR East refers to the "Yamanote Line" as the quadruple-track 20.6 km (12.8 mi) corridor between Shinagawa and Tabata via Shinjuku. The corridor consists of a pair of tracks used by Yamanote local trains and another parallel pair of tracks called "the Yamanote Freight Line" used by the Saikyō and Shōnan-Shinjuku line trains, some limited express services, and freight trains. In everyday usage, branding on maps and station signage,

78-415: A four-track railway ) is a railway line consisting of four parallel tracks with two tracks used in each direction. Quadruple-track railways can handle large amounts of traffic, and so are used on very busy routes or sections. Such conversion is referred to as "quadruplication". A railway line with six parallel tracks, or a sextuple-track railway, has three tracks in each direction. The corresponding term

117-461: A more modern design and has two 15-inch LCD monitors above each door, one of which is used for displaying silent commercials, news and weather; and another which is used for displaying information on the next stop (in Japanese, English, Korean and more) along with notification of delays on Shinkansen and other railway lines in the greater Tokyo area. The predecessor of the present-day Yamanote Line

156-682: A railway license was issued to the Kobe Municipal Transportation Bureau to build a subway line linking the Myōdani district to the Shin-Kobe Shinkansen station; construction on the first segment of that line began on 25 November of that year. The first segment of the subway (between Shin-Nagata and Myodani, known as the Seishin Line) opened on 13 March 1977; a second segment of the line (between Shin-Nagata and Okurayama, known as

195-655: A river, can operate as a quadruple track line. Examples of this can be found in Rhone in France and Rhine in Germany. As it can be seen from the pictures below in the Gallery of diagrams, the four tracks can be paired either by direction (slow and fast in each pair) or by purpose (speed or direction in each pair). Pairing by direction allows the railway to interface to a double track more easily. With fast trains in centre, local stations can be on

234-545: A separate pair of tracks. Construction of new double tracks dedicated to high-speed rail alongside existing conventional double track used by regional and local passenger trains and freight trains is a form of quadruple track. It increases the capacity of that route significantly, and allows for significant increases in inter-city high-speed train frequency with reduced travel times. Long-distance inter-city rail and freight trains are separated from short distance commuter rail. This helps to prevent delays on one service affecting

273-407: Is "sextuplication". There are also instances of railway lines or sections with eight tracks, and cases with three or five tracks. All experience similar upsides and downsides. In quadruple track, trains are sorted in various ways in order to make maximum use of track capacity. These can include one or a combination of: A faster express line and a stopping local line are separated, with each having

312-475: Is about 158%. The ridership intensity of the Yamanote Line in 2018 was 1,134,963 passengers - km / km of route. The daily ridership of the Yamanote Line estimated in a 2015 MLIT National Transit census was about 4 million people per day. However, in both cases "Yamanote Line" refers to JR East's internal definition of the entire rail corridor between Shinagawa and Tabata stations via Shinjuku which includes

351-664: Is one of the two lines of the Kobe Municipal Subway . It links the central districts to the east and western suburbs of Kobe . The line color is green. The line has a reciprocal through service with the Hokushin Line (formerly the Hokushin Kyukuo Electric Railway) ; all trains run between either Tanigami or Shin-Kobe and Seishin-chūō , stopping at every station. During rush hours, additional trains run between Shin-Kobe and Myōdani . On 15 October 1971,

390-560: Is the line's start and terminus) and sometimes Ikebukuro . Certain trains also start from Tamachi in the mornings and end at Shinagawa in the evenings. Trains which run clockwise are known as sotomawari ( 外回り , "outer circle") and those counter-clockwise as uchi-mawari ( 内回り , "inner circle") . (Trains travel on the left in Japan, as with road traffic.) The line also acts as a fare zone destination for JR tickets from locations outside Tokyo, permitting travel to any JR station on or within

429-653: The Narita Express and some liner services. Likewise, from 14 March 2015 onwards, the Ueno-Tokyo Line starts services, which connects the Tōhoku Main Line and Jōban Line to the Tōkaidō Main Line , to provide further relief on the busiest portion of the Yamanote Line today, the segment between Ueno and Tokyo stations. Automatic train control (ATC) was introduced from 6 December 1981, and digital ATC (D-ATC)

SECTION 10

#1732869925149

468-1103: The Ghent - Ostend line as far as Essene-Lombeek. Further quadrupling has recently been carried out as part of the development of the Brussels Regional Express Network . The building of high-speed lines has also led to quadrupling - for instance the HSL 2 high-speed line between Brussels and Cologne runs inside the local lines as far as Leuven . Meanwhile since 1934 Brussels and Antwerp have been connected by two separate pairs of double track. Fast trains normally use line 25 , while line 27 serves slow trains. In places they run parallel, but at times diverge and cross over each other. There are two places in Denmark with four tracks: By definition German railway lines have one or two tracks. Where more tracks are running parallel to each other, they are considered two or more separate lines. Such routes include: There are some quadruple-track railways in

507-582: The Keihin-Tohoku Line tracks were moved slightly to the east to be aligned closer to the Tokaido Shinkansen tracks. The area on the west side of the yard made available will be redeveloped with high-rise office buildings, creating an international business center with good connections to the Shinkansen and Haneda Airport . In October 2022 JR East began performing trial runs for driverless trains on

546-642: The Ministry of Land, Infrastructure, Transport and Tourism : b. ^ Ridership of the section between Shinagawa-Tabata (via Shinjuku) including ridership from the Saikyō and Shōnan-Shinjuku services operating through this section. Ridership in the report estimated from OD surveys and commuter pass data. ^ 「平均通過人員」or average passenger intensity is defined by JR East as Annual passenger-kilometre / route length / number of workdays per year. Quadruple-track railway A quadruple-track railway (also known as

585-529: The Surotto Kansai smart card in October 1999; it would start accepting PiTaPa in October 2006. Women-only cars began to be used on the subway line from 16 December 2002. Currently, one car heading in the direction of Seishin-chūō (car number 4) is reserved for women only; the restriction applies throughout the entire day. All trains are based at Tanigami and Myōdani Depots. A fleet of new trains (known as

624-790: The "Yamanote Line" refers to the local service (also called "system") running the entire 34.5 km (21.4 mi) line looping between the Yamanote corridor via Shinjuku Station and the central portions of the Tōhoku and Tōkaidō Main Lines Via Tokyo Station. (This article uses the same definition unless noted otherwise.) Trains run from 04:26 to 01:04 the next day at intervals as short as 2 minutes during peak periods and four minutes at other times. A complete loop takes 59 to 65 minutes. All trains stop at each station. Trains are put into and taken out of service at Ōsaki (which for timetabling purposes

663-645: The Keihin-Tōhoku tracks, particularly on holidays and during off-peak hours, until rapid service trains were introduced on the Keihin-Tōhoku Line in 1988. A major explosion on the Yamanote Freight Line in Shinjuku in 1967 led to the diversion of freight traffic to the more distant Musashino Line . To address severe undercapacity, the freight line was repurposed for use by Saikyō Line and Shōnan-Shinjuku Line trains, as well as certain limited express trains such as

702-457: The Osaki – Shinagawa section was double-tracked on November 30. The loop was completed in 1925 with the opening of the double track, electrified section between Kanda and Ueno on 1 November, providing a north–south link via Tokyo Station through the city's business centre. A parallel freight line, also completed in 1925, ran along the inner side of the loop between Shinagawa and Tabata. During

741-694: The Oslo region. They are mostly two double tracks with slightly different routes, one older for local trains, and one newer mostly in tunnels for high-speed and regional trains. The country never implemented a quadruple-track line throughout its history, but there are plans for sections of the North–South Commuter Railway (NSCR) to be quadruplicated. Seishin-Yamate Line The Seishin-Yamate Line ( 西神山手線 , Seishin-Yamate-sen ) , also known by its nickname of "Midori no U-Line" ( Japanese : みどりのUライン , lit.   'The green "U" line'),

780-412: The Yamanote Line, most notably at Shinjuku and Ikebukuro (which are now the two busiest passenger railway stations in the world). The contemporary Yamanote Line came into being on 19 November 1956 when it was separated from the Keihin-Tōhoku Line and given its own set of tracks along the eastern side of the loop between Shinagawa and Tabata . However, Yamanote Line trains continued to periodically use

819-623: The Yamate Line) opened on 17 February 1982. The line was extended to Shin-Kobe on 18 June 1985; a western extension to Gakuen-toshi (from Myodani) opened that same day. On 18 March 1987, the final segment of the subway line opened between Gakuen-toshi and Seishin-chūō. The Hokushin Kyuko Electric Railway opened on 2 April 1988, providing service between Tanigami and Shin-Kobe. An infill station ( Seishin-minami ) opened in between Seishin-chūō and Ikawadani stations on 20 March 1993, expanding

SECTION 20

#1732869925149

858-523: The line aimed to begin sometime in 2028. Two sets, 17 and 18, were fitted with the new system and re-entered service on the line as train crew conduct ongoing tests on their performance. Furthermore, the two sets are easy to distinguish with an “ATO” (Automatic Train Operation) sticker located on the front and sides of each set. Once ATO is fully installed, this will be the first line of JR East to feature driverless trains. a. ^ Crowding levels defined by

897-410: The line as the "Yamate Line". Legend Line Rapid Shōnan–Shinjuku and Saikyo Services As of January 2020, the line's services are operated exclusively by a fleet of 50 11-car E235 series EMUs, the first of which was introduced on the line on 30 November 2015. However, a number of technical faults, including problems with door close indicators, resulted in the train being taken out of service

936-496: The line is very heavily used. Sections of the line were running over 250% capacity in the 1990s, remained above 200% for most of the 2000s with most sections dropping below 150% in 2018. This is due to larger and more frequent trains being introduced to the Yamanote Line and the opening of parallel relief lines such as the Tokyo Metro Fukutoshin Line and Ueno–Tokyo Line . The maximum overcrowding during rush hour

975-702: The line to a total of 16 stations. On 17 January 1995, the subway line was shut down due to damage caused by the Great Hanshin earthquake ; the line resumed operation with limited service between Seishin-chūō and Itayado the following day, along with the entirety of the Hokushin Kyuko line. Limited service was resumed across the entire line on 16 February, and full service was restored in March 1995 after repairs were completed, albeit with speed restrictions remaining in place until 21 July of that year. The subway began to accept

1014-540: The loop. This refers to stations on the Yamanote Line as well as the Chūō-Sōbu and Chūō Rapid Lines and between Sendagaya and Ochanomizu . The Yamanote Line colour used on all rolling stock, station signs and diagrams is JNR Yellow Green No.6 ( ■ , Munsell code 7.5GY 6.5/7.8), known in Japanese as " Japanese bush warbler green" ( ウグイス色 , uguisu-iro ) . Due to the Yamanote Line's central location connecting most of Tokyo's major commuter hubs and commercial areas,

1053-518: The morning peak until 10 a.m. From February 22, 2010, the seats were no longer folded up during the morning peak, and all trains were standardized with newly built four-door cars by 31 August 2011. This was due to reduced congestion on the line as well as preparation for the installation of platform doors on all stations by 2017. The E231 series supported a new type of traffic control system, called digital Automatic Train Control (D-ATC). The series also had

1092-619: The other, and is commonly seen in metropolitan areas. Quadrupling may be necessary when a new commuter rail service begins to operate on an existing line. Sometimes the local trains have separate technology, such as electrical system or signalling, which requires strict separation, for example in Berlin or Copenhagen . When a quadruple-track line divides to different destinations part way along, trains need to be sorted by their destination. Passenger trains and freight trains can be separated with each different track. A variation of this can be found on

1131-477: The outside, eliminating staircases for half the passengers. With slow trains in centre or when pairing by speed there can be a common platform for local trains with one staircase and one ticket booth. Sometimes two of the tracks go more straight and with a little distance from the two other. This is a design decision when widening a double track section, and allows higher speed on the faster tracks. Several lines radiating from Brussels are quadrupled, for instance

1170-407: The prewar era, the Ministry of Railways did not issue permits to private suburban railway companies for new lines to cross the Yamanote Line from their terminal stations to the central districts of Tokyo, forcing the companies to terminate services at stations on the line. This policy led to the development of new urban centers ( 新都心、副都心 , shintoshin, fukutoshin ) around major transfer points on

1209-668: The quadruple track section of the Main Northern line in New South Wales between Waratah and Maitland where one pair of tracks are used exclusively for coal trains and the other pair are used for passenger trains and general freight. A similar process, but with all intercity and commuter passenger trains on the outer tracks and thru-freight trains on the inner tracks, was done by the Pennsylvania Railroad on its New York–Washington and Philadelphia–Pittsburgh mainlines prior to

Yamanote Line - Misplaced Pages Continue

1248-472: The ridership of the Saikyō and Shōnan–Shinjuku Lines on the parallel Yamanote freight line. Meanwhile, the ridership of the Yamanote Line services between Tabata and Shinagawa Station via Tokyo are excluded and counted as part of the Tōhoku and Tōkaidō Main Lines. " Yamanote " literally refers to inland, hillier districts or foothills (as distinct from areas close to the sea). In Tokyo, "Yamanote" lies along

1287-588: The same day. The E235 series returned to service on the Yamanote Line on 7 March 2016. All Yamanote Line rolling stock are stored and maintained at Tokyo General Rolling Stock Centre  [ ja ] near Ōsaki Station . Prior to the E235 series, the line's services were operated by E231-500 series EMUs, which were in use from April 21, 2002 to January 20, 2020. These trains originally each included two "six-door cars" with six pairs of doors per side and bench seats that were folded up to provide standing room only during

1326-641: The takeover of operations by Amtrak and Conrail (and later Norfolk Southern ). This is somewhat still done to this day by NS, CSX , and Conrail Shared Assets trains on Amtrak-owned trackage in the Philadelphia area. Future passenger and freight-separated track pairs are planned by the state of Virginia on the corridor between Washington, D.C. and Richmond, Virginia , and by California High-Speed Rail between Los Angeles and Fullerton, California . Two separate double-track lines in proximity to each other, e.g., two double-track lines along opposite sides of

1365-615: The west side of the Yamanote Line. The Seishin-Yamate Line in Kobe and the Yamate area of Yokohama also use this pronunciation. After World War II , SCAP ordered all train placards to be romanized, and the Yamanote Line was romanized as "Yamate Line". It was thus alternatively known as "Yamanote" and "Yamate" until 1971, when the Japanese National Railways changed the pronunciation back to "Yamanote". Some older people still refer to

1404-620: The western side of the Yamanote Line loop. The word consists of the Japanese morphemes yama , meaning 'mountain', the genitive suffix no , and te , meaning 'hand', thus literally translating as "mountain's hand", analogous to the English term "foothills". Yamanote-sen is officially written in Japanese without the kana no ( の、ノ ) , which makes its pronunciation ambiguous in print. The characters 山手 may also be pronounced yamate , as in Yamate-dōri (Yamate Street), which runs parallel to

1443-501: Was built in 1971. The distance between Shinagawa and Tamachi stations was 2.2 km (1.4 mi), making it the longest stretch of track between stations on the Yamanote Line. The new station was constructed on top of the 20-hectare former railyard, which is undergoing rationalization and redevelopment by JR East; it is roughly parallel to the existing Sengakuji Station on the Toei Asakusa and Keikyu Main lines. The Yamanote Line and

1482-476: Was introduced from 30 July 2006. Station numbering was introduced on JR East stations in the Tokyo area from 20 August 2016, with Yamanote Line stations numbered using the prefix "JY". A new station, Takanawa Gateway Station , opened on 14 March 2020. This station was built on the Yamanote Line and Keihin-Tohoku Line between Shinagawa and Tamachi stations, becoming the first new station on the line since Nishi-Nippori

1521-468: Was opened on 1 March 1885 by the Nippon Railway Company, operating between Shinagawa Station in the south and Akabane Station in the north. The top part of the loop between Ikebukuro and Tabata (a distance of 3.3 km (2.1 mi)) opened on 1 April 1903, and both lines were merged to become the Yamanote Line on 12 October 1909. The line was electrified on December 16, 1909, soon after

#148851