The Interstate 24 Bridge may refer to one of two distinct bridges on Interstate 24 .
19-572: The Interstate 24 Bridge is a two-span tied arch bridge that carries I-24 across the Ohio River . Built in 1973, it is 5,623.4 feet (1,714.0 m) in length and has two main spans, 731.5 feet (223.0 m) and 633 feet (193 m) long. It is one of two road bridges connecting the Metropolis - Brookport, Illinois area with Paducah, Kentucky , with the other being the Brookport Bridge upstream to
38-540: A stub . You can help Misplaced Pages by expanding it . This article about a bridge in Tennessee is a stub . You can help Misplaced Pages by expanding it . This article relating to the Interstate Highway System is a stub . You can help Misplaced Pages by expanding it . Tied arch bridge A tied-arch bridge is an arch bridge in which the outward-directed horizontal forces of the arch(es) are borne as tension by
57-426: A chord tying the arch ends rather than by the ground or the bridge foundations. This strengthened chord may be the deck structure itself or consist of separate, independent tie-rods. Thrusts downwards on a tied-arch bridge deck are translated, as tension, by vertical ties between the deck and the arch, tending to flatten it and thereby to push its tips outward into the abutments, like for other arch bridges. However, in
76-523: A single span, two tied-arches are placed in parallel alongside the deck, so the deck lies in between the arches. Axial tied-arch or single tied-arch bridges have at most one tied-arch per span that is usually centered in the middle of the bridge deck. An example for this is Hoge Brug in Maastricht. Since it has hinged hangers it might also classify as a Nielsen bridge who held a patent on tied-arch bridges with hinged hangers from 1926. Some designs tilt
95-769: A tied-arch or bowstring bridge, these movements are restrained not by the abutments but by the strengthened chord, which ties these tips together, taking the thrusts as tension, rather like the string of a bow that is being flattened. Therefore, the design is also called a bowstring-arch or bowstring-girder bridge . The elimination of horizontal forces at the abutments allows tied-arch bridges to be constructed with less robust foundations; thus they can be situated atop elevated piers or in areas of unstable soil . In addition, since they do not depend on horizontal compression forces for their integrity, tied-arch bridges can be prefabricated offsite, and subsequently floated, hauled or lifted into place. Notable bridges of this type include
114-520: A tied-arch; however, the bowstring truss behaves as truss , not an arch . The visual distinction is a tied-arch bridge will not have substantial diagonal members between the vertical members. In a 1978 advisory issued by the Federal Highway Administration (FHWA), the FHWA noted that tied-arch bridges are susceptible to problems caused by poor welds at the connection between the arch rib and
133-632: Is the Fremont Bridge in Portland, Oregon which is the second-longest tied-arch bridge in the world and also classifies as a through arch bridge . The Chaotianmen Bridge in Chongqing is a tied-arch, through arch and a truss arch bridge . Contrarily, the Hart Bridge uses a cantilevered trussed arch, it is self-anchored , but its arch is non-tied. In particular the bridge deck is suspended, but does not tie
152-585: The Fremont Bridge in Portland, Oregon and the first "computer-designed" bridge of this type, the Fort Pitt Bridge in Pittsburgh, Pennsylvania . Both the tied-arch bridge and the self-anchored suspension bridge place only vertical loads on the anchorage, and so are suitable where large horizontal forces are difficult to anchor. Some tied-arch bridges only tie a segment of the main arch directly and prolong
171-523: The apex, it will normally be a two-hinged arch . In the Iron Bridge shown below, the structure of each frame emulates the kind of structure that previously had been made of wood . Such a wood structure uses closely fitted beams pinned together, so the members within the frames are not free to move relative to one another, as they are in a pin-jointed truss structure that allows rotation at the pin joint. Such rigid structures (which impose bending stresses upon
190-666: The arch ends. Tied arch bridges may consist of successively lined up tied arches in places where a single span is not sufficient. An example for this is the Godavari Arch Bridge in Rajahmundry, India. It has four separate supports on each pier and carries the South Central Railway Line of India. It was designed for 250 km/h rail services. Like for multi-span continuous beam bridges the tying chord continually spans over all piers. The arches feet coincide (fuse) at
209-413: The arches outward or inward with respect to the axis running along the bridge deck. In analogy to twin bridges , two tied arch bridges erected side by side to increase traffic capacity, but structurally independent, may be referred to by tied arch twin bridges . Each in return may use a single- or multi-span, discrete or continuous tied-arch design. A bowstring truss bridge is similar in appearance to
SECTION 10
#1733093592451228-413: The arches. Contrarily each abutment on the riverbanks supports a single arch end only, in the middle of the deck. The tying chord(s) consist of a composite deck structure. Four post tensioned coil steel cables, two to each side of the walking deck, are locked in place by orthogonally run steel beams every 7.5 meters. The hangers are joined to each of these beams between each cable pair. Since the beams extend
247-458: The bridge piers. A good visual indication are shared supports at the piers. Dynamic loads are distributed between spans. This type may be combined with the shouldered tied-arch design discussed above. An example for this is Dashengguan Bridge in Nanjing, China. Its two main arches are shouldered by short auxiliary arches. It is both, a (rigid) tied-arch and a cantilevered trussed arch design. Because
266-558: The east. The Interstate 24 Bridge is a continuous box and plate girder bridge over the Tennessee River opened on December 18, 1967. It is just slightly upstream from Nickajack Dam and was within sight of the former Marion Memorial Bridge . This article about a bridge in Illinois is a stub . You can help Misplaced Pages by expanding it . This article about a bridge in Kentucky is
285-423: The elements of the truss bridge and the arch bridge . The actual resolution of forces will depend upon the bridge' design . If no horizontal thrusting forces are generated, this becomes an arch-shaped truss which is essentially a bent beam – see moon bridge for an example. If horizontal thrust is generated but the apex of the arch is a pin joint, this is termed as a three-hinged arch . If no hinge exists at
304-467: The strengthened chord to tie to the top ends of auxiliary (half-)arches . The latter usually support the deck from below and join their bottom feet to those of the main arch(es). The supporting piers at this point may be slender, because the outward-directed horizontal forces of main and auxiliary arch ends counterbalance. The whole structure is self-anchored . Like the simple case it exclusively places vertical loads on all ground-bound supports. An example
323-438: The tie girders, and at the connection between the arch and vertical ties. In addition, problems with electroslag welds , while not isolated to tied-arch bridges, resulted in costly, time-consuming and inconveniencing repairs. The structure as a whole was described as nonredundant : failure of either of the two tie girders would result in failure of the entire structure. Truss arch bridge A truss arch bridge combines
342-471: The traffic runs through the structural envelope, it is also a through arch bridge. Guandu Bridge in New Taipei, Taiwan is a non-trussed example with three main arches augmented by two auxiliary arch segments at the bridge portals. The Infinity Bridge uses two arches of different height and span length that both bifurcate before their apex. Above its single, middle-displaced river pier the deck lies between
361-474: The width of the post-tensioned concrete deck, the tensing cable pairs remain visible. A close-up of the river pier shows that the structural dead load is tied per span: The larger arch span uses thicker tensing cables and the reflex segments are not suspended from, but supported by steel beams, essentially completing the arches at the river pier. However, for dynamic and non-uniform loads the visually defining arch continuations must not be neglected. Usually, for