Goldshöfe station is a station in the German state of Baden-Württemberg at the junction of the Goldshöfe–Crailsheim railway and the Stuttgart-Bad Cannstatt–Nördlingen railway . In addition to its function as a junction station it also serves the towns of Hüttlingen and Buch in the municipality of Rainau , both about two kilometres away. The station was named after the nearby farmhouse of Goldshöfe, which today is part of the Aalen district of Hofen.
41-520: The station was opened on 3 October 1863 with the line to Nördlingen was opened as part of the Rems Railway ( Remsbahn ). A connection to Crailsheim was being planned at that time and the station was designed from its beginning as a junction station. The line to Crailsheim (the Upper Jagst Railway) went into operation in 1866, which subsequently became the more important of the two lines, as part of
82-599: A bus stop, a park-and-ride facility and a covered bicycle stand. Rems Railway The Stuttgart-Bad Cannstatt–Nördlingen railway is a main line in Baden-Württemberg and Bavaria , Germany. It branches off the Stuttgart–Ulm railway at Stuttgart-Bad Cannstatt station and runs via Aalen to Nördlingen , where it merges with the Augsburg–Nördlingen railway . Between Bad Cannstatt and Goldshöfe ,
123-702: A double-track line through the Rems valley and it crosses the Haldenbach river outside Endersbach station on a round-arched viaduct. A low point of 234 metres is reached at Beutelsbach. In Schorndorf, the Wieslauf Valley Railway branches off to Welzheim . The line crosses the Rems before Urbach and follows the course of the Rems until Essingen . In Schwäbisch Gmünd , the Hohenstaufen Railway branched off to Göppingen from 1911 to 1984. The line follows
164-496: A junction station. It is also used for turning, parking and maintaining trains serving the nearby Aalen station . Goldshöfe is served by the RB 89 service to Donauwörth and the MEX 13 service to Crailsheim, with the regular interval timetable providing good interchange opportunities. The InterCity services between Karlsruhe and Nuremberg run through without stopping. The station has
205-679: A workshop was built in Essingen. The line between Bad Cannstatt and Waiblingen was completely closed from 12 May to 9 June 2023 for work on the Waiblingen digital interlocking. It is planned to build two new stations in the Ostalb district. In 2016, it was decided to establish Aalen-West station between the Hofherrnweiler district and the western industrial estate. The station was originally scheduled to open in 2020. However, due to different opinions among
246-675: Is located at the change of curves, where the bend to the left changes to a bend to the right. Between Fellbach and Waiblingen there is another elongated, single-track flyover structure that was built before the S-Bahn went into service. This allows trains to and from Schwäbisch Hall-Hessental to cross trains on the Remsbahn without getting in each other's way. A fifth track was later built here to reduce interference between fast trains and S-Bahn trains. The Waiblingen–Schwäbisch Hall railway branches off at Waiblingen station . The Rems Railway continues as
287-569: Is measured from Stuttgart Bad Cannstatt station . A short distance from the station, the four tracks of the line separate from the Fils Valley Railway at a flying junction . At about the same point, the tracks of the Rems line are rearranged to be paired by direction of operation, with S-Bahn trains running on the outer tracks and regional and long-distance trains running on the inner tracks. The line climbs about 60 metres on an S-bend on its way to Fellbach . Stuttgart Nürnberger Straße station
328-560: Is supplemented by the IRE 1 Interregio-Express service, which runs every two hours between Karlsruhe and Aalen, with intermediate stops in Schorndorf and Schwäbisch Gmünd. Between Aalen and Donauwörth, regional trains on line RB 89 run every hour from Monday to Friday. Until the 2022/2023 timetable change, operations were operated by DB Regio Bayern as part of the E-Netz Augsburg under
369-678: Is the main line from Stuttgart-Bad Cannstatt via Aalen to Nördlingen. Today the designation Remsbahn only refers to the section from Stuttgart to Aalen, while the Aalen–Nördlingen section is considered part of the Riesbahn (Ries Railway). Between Waiblingen and Essingen , the Remsbahn runs parallel to the River Rems from which it gets its name. The Riesbahn is named after the Nördlinger Ries and continues to Donauwörth . The line's chainage
410-737: The LGV Sud-Est , at Pasilly where the line to Dijon diverges, and on the LGV Atlantique at Courtalain where the line to Le Mans diverges, are fully grade-separated with special high-speed switches ( points in British terminology) that permit the normal line speed of 300 km/h (186 mph) on the main line, and a diverging speed of 220 km/h (137 mph). The LGV network has four grade-separated high-speed triangles: Fretin (near Lille), Coubert (southeast Paris), Claye-Souilly (northeast Paris) and Angles (Avignon). A fifth, Vémars (northeast Paris),
451-696: The Kornwestheim–Untertürkheim line), to relieve Stuttgart Hauptbahnhof of freight traffic. At the end of World War II , the German military blew up the viaduct over the Haldenbach west of Endersbach station and the bridge over the Kocher west of Aalen, so that the intervening places were only accessible via the Hohenstaufen Railway from Schwäbisch Gmünd to Göppingen on the Fils Railway. Pioneers of
SECTION 10
#1732863333862492-599: The RE lines. Since Go-Ahead took over operations on 9 June 2019, Stadler FLIRT multiple units have been used. Siemens Mireo electric multiple units are operated by Go-Ahead Bayern between Aalen and Donauwörth. One InterCity service, IC 61 runs at two-hour intervals on the Karlsruhe –Nuremberg route, stopping in Stuttgart, Schwäbisch Gmünd and Aaalen. One pair of trains, extending to and from Leipzig , also stops in Schorndorf at
533-465: The Rems line, continuing to Nördlingen and Donauwörth to Munich . This route was chosen for touristic reasons despite the longer travel time. The route, however, had low patronage and lacked compatibility with the reinstated InterCity system. The electrification of the line from Goldshöfe via Crailsheim to Nuremberg in 1985 allowed trains on the Rems line to Nuremberg, which had previously been hauled by diesel locomotives, to be electrically hauled. In
574-547: The Rems valley would be considerably lower as it would share part of the Stuttgart–Ulm route. In the subsequent discussions, the requests of the cities of Waiblingen and Schorndorf for a rail connection, the smaller climbs, which would allow easier operations and the shorter route between Stuttgart and Aalen contributed to the decision to select the first variant. Thus, on 25 July 1861 the line opened from Cannstatt via Waiblingen, Schorndorf, Gmünd and Aalen to Wasseralfingen. This
615-550: The Stuttgart– Dresden and Stuttgart– Prague routes. The trains in the opposite direction ran alternatively via Schwäbisch Hall-Hessental . The line was renovated in 2009 and, among other things, around 68 kilometres of track and 47 sets of points were renewed. The platforms at the Westhausen, Lauchheim, Aufhausen, Bopfingen and Pflaumloch stations were also rebuilt to provide accessibility . From 24 April to 15 October 2009,
656-685: The U.S. Army built a temporary bridge in Endersbach, so that in August 1945 the line was accessible again. Traffic was also restored over the Kocher in Aalen during the summer of 1945. The Rems Railway was electrified, starting from Stuttgart, to Waiblingen in 1949, to Schorndorf in 1962, to Aalen in 1971 and in 1972 on the Ries Railway from Aalen to Nördlingen and Donauwörth . The line was electrified as an alternative route for traffic between Stuttgart and Munich to
697-706: The challenge of building the line over the Swabian Alb up the Geislinger Steige . The Fils Railway was opened in 1850. But after the first phase of the network of the Royal Württemberg State Railways was completed, the construction of a railway line to the east of the country was soon back on the agenda. The main objectives put forward for the project, originally called the Nordostbahn (“Northeast Railway") were: The architect responsible for planning
738-521: The course of the Rems to Essingen. While the Rems flows into the main valley from the south, the Remsbahn follows the main valley to the east, which runs over a watershed near Essingen into the Kocher valley. A tunnel was originally planned for this watershed, but a slightly longer route with a curve and a cutting was built. Over the course of this valley, a predominantly straight line could be built without major artificial structures. After Aalen Hauptbahnhof ,
779-489: The early 1980s, Deutsche Bundesbahn introduced approximately hourly expresses on the line. For the summer 1988 timetable, modernised vehicles were introduced running hourly all day. These trains ran from the summer 1989 timetable under the generic name of RegionalSchnellBahn ("regional fast rail"). In 1996, the interval between Stuttgart S-Bahn services was reduced in the peak period from 20 minutes to 15 minutes. Before its introduction, Deutsche Bundesbahn had suggested that
820-408: The end of the day. Flying junction A flying junction or flyover is a railway junction at which one or more diverging or converging tracks in a multiple-track route cross other tracks on the route by bridge to avoid conflict with other train movements. A more technical term is " grade-separated junction ". A burrowing junction or dive-under occurs where the diverging line passes below
861-479: The increase in services would require additional tracks on the section between Waiblingen and Schorndorf, which was almost at capacity with the combined operation of S-Bahn and other trains on it. However, a report by RWTH Aachen University in 1993 came to the conclusion that the planned operations could be realised by shortening signal blocks on the line and modifying Waiblingen station. Deutsche Bundesbahn agreed to implement these measures in 1993 and new signalling
SECTION 20
#1732863333862902-464: The level rather than by subways. The "Rems 1" track is now closed. Until 1985 there was a rail connection from the "Rems" parts of station to the Upper Jagst Railway, which was built when the local freight yard was established. The goods shed still exists, but in the meantime it has lost its function. The station is classified by Deutsche Bahn as a category 5 station . Its main purpose is as
943-481: The line between Schorndorf and Nördlingen was completely closed in two construction phases. During the closure there was a rail replacement bus service for local transport. During this time, Intercity Line 61 (Nuremberg–Karlsruhe) was diverted between Crailsheim and Waiblingen via Schwäbisch Hall-Hessental. The project cost €50 million. Further renovation work related to the Schorndorf–Waiblingen section and
984-542: The line continues north along the Kocher to Goldshöfe station . The line to Crailsheim branches off to the north; originally Goldshöfe station was built to allow changes of train and it was not intended to serve the local population. Up to the end of the line in Nördlingen, a somewhat more winding route and a tunnel through the foothills of the Swabian Jura near Lauchheim were necessary. A railway between Stuttgart and Ulm
1025-583: The line is part of the long-distance inter-regional connection between Stuttgart and Nuremberg . The line has two tracks from Bad Cannstatt to Goldshöfe and the remaining section is single track. The line is fully electrified and the western section from Stuttgart to Schorndorf is part of the Stuttgart S-Bahn . The line is also known as the Remsbahn (Rems Railway) or the Remstalbahn (Rems Valley Railway) and
1066-723: The line via Ulm for the Olympic Games in Munich . From 1978 to 1981, a third and fourth track were built on the Bad Cannstatt–Waiblingen section and a flying junction was built between Fellbach and Waiblingen where the Murr railway branches off, so that in 1981 Stuttgart S-Bahn services could operate to Backnang and Schorndorf. In 1983 and 1984 a portion of the Rheingold ran from Mannheim via Heidelberg , Heilbronn , Stuttgart and over
1107-455: The line, Georg Morlok examined four major variants for the route with different locations for the transition from the Neckar and Fils valley to the Rems valley. These were from west to east: Although the cost of crossing the mountain range was found to be least for the western variant, the total cost of the eastern variant was the lowest, because the length of track that would have to be built in
1148-454: The main line between Stuttgart and Nuremberg . Nevertheless, in 1972 the line to Nordlinger was electrified as an alternative route for traffic between Stuttgart and Munich to the line via Ulm for the Olympic Games in Munich . The Crailsheim line was electrified in 1985. The station building, which is T-shaped, is typical of stations built in Württemberg at the time and is built between
1189-419: The main line. The alternative to grade separation is a level junction or flat junction, where tracks cross at grade , and conflicting routes must be protected by interlocked signals . Simple flying junctions may have a single track pass over or under other tracks to avoid conflict; complex flying junctions may have elaborate infrastructure to allow multiple routings without trains coming into conflict, in
1230-533: The manner of a highway stack interchange . Where two lines each of two tracks merge with a flying junction, they can become a four-track railway together, the tracks paired by direction. This happens regularly in the Netherlands (see Examples below). Nearly all junctions with high-speed railways are grade-separated. On the French Lignes à Grande Vitesse ( TGV ) high-speed network, the principal junction on
1271-696: The name Fugger-Express . In December 2022, Go-Ahead took over from DB Bayern. Since then, the hourly service has run daily (previously every two hours on weekends). In addition, trains continue every two hours as RE 89 via Donauwörth to/from Augsburg and Munich . The carriages used in regional transport until 2015 were mainly renovated Silberling carriages. From the timetable change on 12 December 2010, Regional-Express trains at weekends largely consisted of double-deck carriages built from 1994 to 1996. Since 1 February 2016, six trains were also operated with double-deck coaches from Monday to Friday. From 1 October 2016 to 8 June 2019, only double-decker coaches ran on
Goldshöfe station - Misplaced Pages Continue
1312-460: The operation of small and medium-sized railway sidings and freight yards were closed. But the once large freight yard at Schwäbisch Gmünd is also now closed. From December 2002 to December 2003, the line was closed due to a landslide on the Bildwasen Tunnel between Lauchheim and Aufhausen . The east portal of the tunnel was then extensively renovated. Until 2006, night trains ran via Aalen on
1353-680: The parties involved regarding the appropriate platform height, there was a delay of several years, so that construction can probably only begin in the mid-2020s. Lines S 2 and S 3 of the Stuttgart S-Bahn serve the Stuttgart–Waiblingen section and line S2 serves the Waiblingen–Schorndorf section. The MEX 13 service from Stuttgart to Aalen operate every 30 minutes on weekdays, every hour to Ellwangen and every two hours to Crailsheim. Intermediate stops are Bad Cannstatt, Waiblingen, Schorndorf and then all stations. This
1394-686: The second section to Nördlingen was opened, connecting the Rems line to the Bavarian Ludwig South-North Railway . This was after the line crossing the border at Ulm / Neu-Ulm (now part of the Ulm–Augsburg railway ), the second link built between the railways of Württemberg and Bavaria. The 3.75 km section between the border and the Bavarian town of Nördlingen was operated by the Württemberg State Railways on lease. There
1435-447: The two lines that separate the front of the station. Each of the two sections has two platform tracks. Later both the line to Nördlingen and the line to Crailsheim are single-track, while the line from Aalen has two tracks. The platform tracks of both lines are numbered 1 and 2, and are distinguished by the prefix of "Jagst" or "Rems". In the timetable the prefixes are abbreviated to "J" and "R”. The tracks are crossed via planks crossings on
1476-468: Was a separate entrance in the Nördlingen terminus, with its own hall for the Rems Railway. The line was initially built as a single track, but duplication was planned from the outset. It was duplicated from Cannstatt to Fellbach in 1864, Waiblingen in 1876, Schorndorf in 1899, Lorch in 1902, Deinbach in 1905, Gmünd in 1910, Unterböbingen in 1920, then Essingen, and Aalen in 1926. The Aalen–Goldshöfe line
1517-575: Was carried out from July to September 2013. The S2 therefore only ran every half hour during peak hour and the Regional-Express between Aalen and Stuttgart every hour. The section was completely closed from 30 August to 2 September 2013 and a rail replacement service was established. On 9 June 2019, Go-Ahead Verkehrsgesellschaft Deutschland took over regional services on the Waiblingen–Aalen section from DB Regio Baden-Württemberg . A depot with
1558-435: Was duplicated in 1866, completing the duplication achieved to date. On 1 May 1897, the connecting line was opened from Untertürkheim to the Rems line towards Fellbach. It opens just before the site of the current Rems line Nürnberger Straße station , creating a triangular junction between Bad Cannstatt, Untertürkheim and Nürnberger Straße. Its purpose was, together with today's Schuster Railway ( Schusterbahn , then called
1599-645: Was implemented on the Waiblingen–Schorndorf section with the Ks-Signalsystem . It was found that the timetable was still vulnerable to disruptions. To resolve this, a fifth track was installed in about 2000 on the section between Fellbach and Waiblingen, so that long-distance and S-Bahn trains could run from Fellbach to Waiblingen towards Schorndorf at the same time. Simultaneously with these upgrades for passenger traffic, freight facilities were dismantled everywhere, as elsewhere in Germany at this time, and in particular
1640-478: Was one of the first railways proposed in Württemberg in the middle of the 19th century. Alternative alignments via Aalen or directly via Göppingen were discussed. At first it seemed the first route, even though it was indirect, had a greater chance of being built, as it required no major climbs, in contrast to the second route. After several years of discussion it was decided to build the route via Göppingen, despite
1681-473: Was the location of the Schwäbische Hüttenwerke, then a major state steelworks. This steelworks delivered all of its steel that was moved by rail via the Rems line until the mid-1860s. The fastest regular service at the time ran between Wasseralfingen and Stuttgart in 2 hours, 55 minutes. The line was equipped with signalman's houses about once every kilometre and with an electric telegraph. In 1863,