Misplaced Pages

Folkestone West railway station

Article snapshot taken from Wikipedia with creative commons attribution-sharealike license. Give it a read and then ask your questions in the chat. We can research this topic together.
#206793

62-574: Folkestone West railway station is on the South Eastern Main Line in England, serving the western area of Folkestone , Kent. It is 69 miles 22 chains (111.5 km) down the line from London Charing Cross . All trains that call are operated by Southeastern . The ticket office, in a room on the extensive 'up' side buildings on the London-bound platform, is staffed only during part of

124-407: A breakwater and provided an anchorage. The SER built a steeply-graded branch line to the harbour, with a reversal required to reach it. It opened to freight in 1843. Passengers were transferred from Folkestone station to the harbour by bus, with mail and freight going by rail. A swing bridge was constructed in 1847, and Folkestone Harbour station opened in 1850. Ships could berth at any state of

186-494: A month later, on 1 October. The LCDR reached Ashford in 1884 from Swanley Junction via Maidstone . They built their own station, Ashford West . It was not until 1 November 1891 that a connection was made between the two lines. On 1 October 1892, the Cranbrook and Paddock Wood Railway opened their branch from Paddock Wood to Hope Mill, for Goudhurst and Lamberhurst . It was extended to Hawkhurst on 4 September 1893. In 1905,

248-540: A reduced service was operated from 5 May, a skeleton service having operated in the interim. A new signal box was built, coming into service on 16 December. British Railways started to implement its 1955 Modernisation Plan . This extended electrification to the Kent Coast in two stages, with the South Eastern Main Line being subject of "Kent Coast Electrification - Stage 2". As part of Stage 1, Chislehurst Jn

310-431: A short section of the line through Ashford is also electrified at 25 kV AC . Over the years, a number of accidents have occurred at various locations on the South Eastern Main Line. Stopping services run from Charing Cross or Cannon Street to Orpington or Sevenoaks , with other services on the route running fast over this section. Beyond Sevenoaks, stopping services originating from Tunbridge Wells , just off

372-546: Is a major long-distance railway route in South East England , UK , one of the three main routes crossing the county of Kent , going via Sevenoaks , Tonbridge , Ashford and Folkestone to Dover . The other routes are the Chatham Main Line which runs along the north Kent coast to Ramsgate or Dover via Chatham and High Speed 1 which runs through the centre of Kent to the coast at Folkestone where it joins

434-463: Is made near Gillingham . As built the station had two platforms with the station buildings being on the Down side. A note on the working drawings states that the station had to be visible from Fort Pitt . About 1881 it was rebuilt with two island platforms, and the station buildings were moved onto the road bridge, then known as Rome Place. In 1958 the station was converted back to two platforms as part of

496-527: Is on the Chatham Main Line in England, serving the town of Chatham , Kent. It is 34 miles 25 chains (55.2 km) down the line from London Victoria and is situated between Rochester and Gillingham . The station and most trains that call are operated by Southeastern . Following a timetable change on Sunday 20 May 2018, some trains are operated by Govia Thameslink . There are two platforms, one for each direction and both capable of accommodating 12-coach trains. There are tunnels at either end of

558-661: The Canterbury West line (to Ramsgate and beyond), High Speed 1 and Marshlink (to Hastings). As of December 2022 there are four off-peak "Kent Coast" services between London and Tonbridge: From Ashford International to Dover Priory there is a further 1tph formed by a HS1 service from St Pancras. There are a further four "Metro" services on the suburban part of the line: Services are formed using SE Trains ’s fleet of Class 375 and Class 376 Electrostar s and older Class 465 and Class 466 Networker units. Previously Class 377 or Class 455s operated by Southern ran on

620-643: The Channel Tunnel with the Venice Simplon Orient Express train in Calais . 51°05′06″N 1°09′14″E  /  51.085°N 1.154°E  / 51.085; 1.154 Other alternative routes from London to Dartford via Sidcup and via Bexleyheath . South Eastern Main Line A detailed diagram of the line can be found at South Eastern Main Line diagram The South Eastern Main Line

682-564: The Channel Tunnel . The line was built by the South Eastern Railway (SER), which was in competition with the London, Chatham and Dover Railway (LCDR), hence the duplication of routes in Kent. The original main line was given sanction by Act of Parliament in 1836. The route first authorised was from London Bridge via Oxted , Tunbridge , Maidstone , Ashford and Folkestone . The route

SECTION 10

#1733084960207

744-585: The Elham Valley Railway . It opened between Canterbury and Shorncliffe in 1889, stopping the LCDR from building its rival scheme, to which there was much opposition amongst the residents of Folkestone. The line opened in 1889. On the main line, two stations were built west of Folkestone: Cheriton Arch and Shorncliffe Camp , which replaced the earlier Shorncliffe & Sandgate station. Cheriton Arch opened on 1 September 1884. The new Shorncliffe Camp opened

806-565: The G class. In 1900, Harry Wainwright introduced the C class 0-6-0s for freight, and D and E class 4-4-0s for express passenger work. The latter two classes were capable of 75 miles per hour (121 km/h). The track having been upgraded to enable running at such speed. Richard Maunsell introduced the River class 2-6-4Ts in 1917 for express passenger trains. Post-war , the D and E classes were rebuilt with superheaters . The rebuilt locomotives were designated as classes D1 and E1. With

868-471: The Kent and East Sussex Railway extended their line from Tenterden Town to Headcorn. A junction was built just east of the station. In 1910, work began on the construction of Dover Marine station, groundwork for which was to take three years to complete. The station opened on 2 January 1915 for ambulance trains . From the outset, the line was worked by steam locomotives . Early locomotive classes that worked

930-402: The 1850s, Folkestone saw more traffic than Dover, although the latter port was growing at a faster rate. In 1857, a new direct connection was put in at Tunbridge Junction, enabling trains to reach Hastings without reversing. The station at Tonbridge was rebuilt on a new site just west of the original. The LCDR built their line to Dover , which opened in 1861, providing a route to London that

992-407: The 1870s, James Stirling introduced a number of new classes: the B and F class 4-4-0s for express passenger work; the O class 0-6-0s for freight; and the A class 4-4-0s and Q class 0-4-4Ts for local passenger work. The R class 0-6-0Ts were built to perform banking duties on the branch from Folkestone Harbour to Folkestone Junction. Classes F, O and Q accounted for the majority of

1054-507: The 459 locomotives in the six classes. The SER and LCDR agreed in 1898 to form a working arrangement. The South Eastern and Chatham Railway (SECR) came into being on 1 January 1899. The new company was short of locomotives and was glad to acquire five 4-4-0s that the Great North of Scotland Railway had ordered from Hurst, Nelson & Co Ltd , Glasgow but which subsequently had become surplus to their requirements. These locomotives became

1116-645: The Channel Tunnel Rail Link (CTRL), services ran over the South Eastern Main Line to Petts Wood, leaving at Chislehurst junction onto the Chatham Main Line . Freight services for the Channel Tunnel were routed via the Maidstone East Line . The CTRL was built alongside the line to Ashford where is joined in to gain access to the existing station. The CTRL diverges west of Ashford to pursue a separate route to its new London terminus ( St Pancras ). Thus

1178-510: The Kent Coast Electrification Scheme, Stage 1. The station had been electrified in 1939 but the 1958 scheme lengthened the platforms to 12 car EMUs, which due to the geography of the station - between two tunnels - necessitated the abandoning of the other platforms. A modern entrance and booking hall replaced the originals in 1981. Further remodelling in the 1990s and 2000s has seen the ticket office moved twice, accompanied by

1240-544: The London and Brighton's line at Reigate Junction , which the London and Brighton opened to traffic on 12 July 1841. Leaving the Brighton line, the railway took a direct route to Folkestone ; plans to serve Maidstone were abandoned. A branch line was to be built from Maidstone Road instead. The line was almost direct between Redhill and Ashford, not deviating by more than 0.5 miles (800 m) in either direction. The engineer

1302-529: The SECR obtained powers to electrify their lines. At a meeting in 1913, SECR chairman H. Cosmo Bonsor said that the time was not right for the company to incur the heavy expenditure of electrification. The outbreak of war meant the postponement of any plans to electrify suburban lines. With the passing of the Trades Facilities Act 1922, the SECR proposed to electrify a number of lines in three stages. The SEML

SECTION 20

#1733084960207

1364-627: The SEML to see electric trains was Orpington, which was the terminus for electric trains from Victoria via Herne Hill and Shortlands . Public services commenced on 12 July 1925. In preparation for Stage 2 of the electrification, the lines between Charing Cross and Metropolitan Junction were remodelled. Semaphore signals were replaced by colour light signals , with a new temporary manual signal box provided at Charing Cross. The lines serving Cannon Street were electrified. Electric trains were due to start on 1 December 1925, but power supply problems meant that

1426-575: The SER a parcel of land on which the station was built. The SER wanted to build the hotel at a position where it would serve both cross-channel and local traffic. They approached the Harbour Commissioners for permission to buy the desired site, but were refused on the grounds that they had not built on land they had previously purchased. Thus the Lord Warden Hotel was built, opening in 1851. Through

1488-433: The SER were to make its junction further south. The London and Brighton were to construct the line, and the SER were to purchase it at cost on completion. Both companies would operate trains over the route. The London and Brighton took advantage of this to ensure that gradients would be kept as shallow as possible, even at the expense of substantial earthworks and a mile-long tunnel at Merstham . The SER main line diverged from

1550-679: The abolition of 32 signal boxes, with eleven more reduced to occasional use and one being manned during morning peak hours only. Electric services on the full length of the SEML began on 12 June 1961. This was accompanied by a voltage upgrade to 750 V DC across the whole the Southern Region. Completion of the scheme would allow the phasing out of steam from the Eastern area of the Southern Region of British Railways . Folkestone East closed to passengers on 6 September 1965. In December 1969, it

1612-477: The abolition of seven more manual boxes. The increased services provided by electric trains meant that there were fewer paths available for freight trains to reach the marshalling yard at Hither Green. Therefore, the Greenwich Park Branch Line , which had closed on 1 January 1917 and thereafter was only used by freight trains as far as Brockley Lane , was brought back into use on 30 June 1929 as far as

1674-524: The branch line from Paddock Wood to Maidstone . It opened on 25 September 1844. In May 1844, permission was gained to build a railway from Ashford to the Isle of Thanet , serving both Margate and Ramsgate. The line opened as far as Canterbury on 6 February 1846. In 1845, permission was obtained to build a branch line to Tunbridge Wells . This line opened on 19 September 1845, and was extended to Hastings , East Sussex in 1852. Also in that year, permission

1736-455: The cliff face. An estimated 1,000,000 tons of chalk was dislodged. As the chalk in Shakespeare's Cliff was not as strong as that of Abbot's Cliff, two single line tunnels were bored. East of Shakespeare Tunnel , a low trestle bridge was built across the beach to gain access to Dover. The line between Folkestone and Dover opened on 7 February 1844. In 1843, permission was obtained to build

1798-494: The day; at other times a PERTIS permit to travel machine, located outside the ticket office, suffices. The substantial 'down' (country-bound) platform building is occupied as offices by Network Rail . The South Eastern Main Line reached Folkestone in 1843, with a station being opened at Folkestone Junction (Folkestone East) on 18 December 1843. Folkestone West was opened on 1 November 1863 as Shorncliffe Camp, initially with two platform faces either side of double track. In 1881

1860-759: The footbridge. The new bridge has lifts enabling step-free access. This work was completed as part of the Access for All scheme. Asquith Xavier plaque A plaque in the waiting room commemorates Asquith Xavier , a local resident who ended a colour bar at British Railways in London by fighting to become the first non-white train guard at Euston railway station in 1966. Services at Chatham are operated by Southeastern and Thameslink using Class 375 , 395 , 465 , 466 and 700 EMUs . The typical off-peak service in trains per hour is: Additional services, including trains to and from London Charing Cross via Sidcup , and fast trains to and from London Cannon Street call at

1922-401: The introduction of electric trains from Charing Cross and Cannon Street to Orpington was postponed until 28 February 1926. Cannon Street was closed from 5–28 June 1926 for alterations to the track layout and platforms. On 27 June, new four aspect colour light signals were brought into use between Cannon Street, Charing Cross and Borough Market Junction. New power signal boxes came into service at

Folkestone West railway station - Misplaced Pages Continue

1984-596: The introduction of electric trains in the late 1920s, a large number of three-car electric multiple units and two-car trailer sets were built. Some were built new by the Metropolitan Carriage, Wagon and Finance Company with trailers by the Birmingham Railway Carriage and Wagon Company , but the majority were converted from ex-SECR, LBSC or LSWR carriages. The former LBSC 6.7kV AC electric multiple units were also converted. After World War II , many of

2046-657: The line between the London terminus and London Bridge. The major rail depots, visible near Hither Green , are the Hither Green Traction Maintenance Depot (TMD) and the nearby Grove Park Depot and Sidings . Picturesque and unfamiliar sights (to visitors) on the line are oast houses , traditional farm buildings used for drying hops , whose conical roofs are tipped by distinctive cowls . 51°10′21″N 0°32′9″E  /  51.17250°N 0.53583°E  / 51.17250; 0.53583 Chatham railway station, Medway Chatham railway station

2108-405: The line include the "Little Mail", and "Mail" class 2-2-2s . By the 1860s the speed limit on the line was 60 miles per hour (97 km/h). In those days, shingle was used for ballast. This was fine for the speeds and train weights then in use, but became less satisfactory as train speeds and weights increased. The use of shingle ballast was a factor in a serious accident at Sevenoaks in 1927. In

2170-507: The line was extended to Orpington and Sevenoaks . The line between Sevenoaks and Tonbridge opened to freight in February 1868, and to passengers on 1 May 1868. Sevenoaks Tunnel took five years to build, from 1863 to 1868, It is 3,493 yards (3,194 m) long. On opening, it was the fifth longest railway tunnel in the United Kingdom. This new line meant that the old main line from Redhill

2232-503: The main line, cover the stations with other services on the route running fast over this section At Tonbridge services from the original main route – now the rural Redhill–Tonbridge line – join from Redhill , while the main line to Hastings via Tunbridge Wells diverges. At Paddock Wood the Medway Valley line diverges. At Ashford the Maidstone East Line (from Swanley) and High Speed 1 joins, while several lines diverge:

2294-446: The opening, closing and re-opening of retail areas. A small, general corner store also opened. The building is located at one side of the road bridge (now Railway Street) over the track, with a taxi rank located between the road and the building. Stairs lead down to the platforms. A cafe is located on the London bound platform. There is also a coffee shop located at the main entrance of the station. In May 2021, work began on replacing

2356-417: The peak hours, there are also services to and from London Cannon Street and there is also 1 train per day to London Victoria . Belmond transferred their Orient Express luxury train services to a new facility at Folkestone West from their original location at Folkestone Harbour . The company runs two British Pullman trains per week between the end of March and the beginning of November, which connect via

2418-419: The point at which it crossed the SEML, a new spur being provided to give access to Hither Green. The reopened section of line was also electrified and provided with four aspect colour light signalling. In 1934, it was announced that the electrification of the SEML would be extended to Sevenoaks, including the loops at Chislehurst Jn. Electric services from Sevenoaks began on 6 January 1935. In February 1936, it

2480-420: The station was rebuilt with two platform faces either side of four tracks. Sometime around 1887 a bay was added to the down platform as from 1887 to 1947 the station served as the southern terminus and interchange for the Elham Valley Railway with services to Canterbury . The station was altered during the 1960–61 Kent Coast Electrification as the line from Folkestone Central to near the site of Cheriton Junction

2542-597: The station: Fort Pitt Tunnel (428 yards) at the London end, and Chatham Tunnel (297 yards) at the country end. The station was opened on 25 January 1858, when the London, Chatham and Dover Railway (LCDR) (then known as the East Kent Railway ) opened a single line eastwards to Faversham . Two months later (29 March 1858) the link with the North Kent Line at Strood was opened; and the new railway reached Dover Priory in 1861. The Chatham Dockyard branch connection

Folkestone West railway station - Misplaced Pages Continue

2604-400: The three-coach units were reformed as four-car units by the addition of an ex-LSWR 10-compartment carriage. Some units gained a brand new carriage. Other units were formed from various carriages that were part of units that had been damaged by accidents or enemy action. From 1946 to 1950, a number of units were built at Eastleigh Works . The units collectively were designated 4SUB . In 1903,

2666-540: The tide. The SER started a cross-channel steamship service to Boulogne. At Dover, the River Dour had formed a shingle spit and thus a small harbour which required constant dredging to keep open. Cross-Channel traffic was operated by Admiralty ships to Calais. Neither French port was connected by railway at the time. The SER partly financed the construction of the Boulogne & Amiens Railway , which opened in 1848. Calais

2728-526: The tunnels on the Hastings line had skimped on the construction by using an insufficient number of rings of bricks to line the tunnels. Rectification resulted in a restricted loading gauge on that line, a situation that was to last until 1986. This "cut-off" line, 24 miles (39 km) in length, reached Chislehurst & Bickley Park on 1 July 1865. This station was replaced with a new one 600 yards (550 m) further south, which opened on 2 March 1868 when

2790-418: The tunnels to allow ordinary stock to work through them. In 1954, Charing Cross, and to a lesser extent London Bridge, were remodelled to enable them to handle 10-coach trains on the suburban network. Cannon Street station was remodelled in 1955. On 5 April 1957, a fire destroyed the signal box at Cannon Street and severely affected the operation of trains. Following the construction of a temporary signal box,

2852-602: The two termini, but Metropolitan Junction remained a manually-worked box, although it was provided with a new 60-lever frame. With the introduction of the new service on 28 June, a new station was opened at Petts Wood . On 30 June 1929, four-aspect colour light signals were introduced between New Cross and Hither Green . New power signal boxes were provided at St Johns and Parks Bridge Jn, enabling seven manual boxes to be abolished. On 1 December 1929, four-aspect colour light signals were introduced between Spa Road and New Cross. A new power box at North Kent East Junction allowed

2914-402: Was 16 miles (26 km) shorter that the SER line via Redhill . In May 1862, authorisation was obtained to construct a new railway from St Johns , London to Tonbridge, which reduced the distance from London to Tonbridge and points east by about 13 miles (21 km). Construction of the tunnels was well supervised by the SER, for it had been discovered by then that the contractors who had built

2976-549: Was Sir William Cubitt . To facilitate fast running, Tunbridge , Maidstone Road and Ashford stations were built with through roads. Headcorn station was to be rebuilt on a similar plan in 1924. Construction began in November 1837 from Reigate Junction eastwards, and in both directions from Tunbridge. The line from London Bridge to Tunbridge opened on 26 May 1842. The line between Tonbridge and Ashford opened on 1 December 1842. No major engineering works were needed until Folkestone

3038-504: Was announced that all electric multiple units built before 1939 were to be withdrawn by 1972. In 1972, work began on rebuilding and resignalling London Bridge, with a new power signal box built at London Bridge . The scheme cost £23.5 million and was completed in December 1978. The line was largely left untouched, until the arrival of the Channel Tunnel at Cheriton, near Folkestone. Prior to construction of High Speed 1 , also known as

3100-577: Was announced that the SR intended to extend electrification of the SEML to Tonbridge, as part of a scheme to electrify the Hastings line. In February 1937, it was announced that this part of a wider electrification scheme would be completed in January 1939. However, in February 1938, it was announced that the Hastings electrification had been abandoned due to the cost of having to either build dedicated rolling stock or rebore

3162-562: Was largely out of SER's hands. The harbour itself was under the control of the Harbour Commissioners, who were deputies of the Lord Warden of the Cinque Ports . Other land that might be developed was in the hands of the Admiralty. Dover Corporation had no influence over either body. They were forced to watch the development of Folkestone as a port whilst little was done to improve things in what

SECTION 50

#1733084960207

3224-616: Was obtained to build a railway from Ashford to Hastings, which opened on 13 February 1851. Tunbridge station was renamed Tunbridge Junction on 1 February 1852. Both Dover and Folkestone provided access to the English Channel , and thus to the French ports of Calais and Boulogne . At Folkestone, the Pent Brook stream that ran through the Foord Gap had built up a spit of shingle, which acted as

3286-436: Was of a different character, and was found to be unstable. Cubitt sought the advice of Lieutenant Hutchinson, Royal Engineers , who had experience in using dynamite in the clearing of the wreck of HMS  Royal George in 1840. It was decided to blow the cliff away over a distance of 500 ft (150 m). On 18 January 1843, a total of 18,500 lb (8,400 kg) of gunpowder was used in three charges to blow away

3348-552: Was quadrupled. Following the opening of the Channel Tunnel and the loss of the boat train traffic, in 1994 the two centre tracks were removed. In 2008 alterations were made on the north side of the station to provide car parking and coach loading bays, the latter in connection with the operation of the 'Orient Express' which until then operated from Folkestone Harbour Station . All services at Folkestone West are operated by Southeastern using Class 375 and 395 EMUs . The typical off-peak service in trains per hour is: During

3410-425: Was reached by rail in that year. Larger and larger ships were built for the cross-Channel service; these could use Folkestone Harbour only at high tide in the 1860s whilst the pier was extended. Trains connecting with cross-Channel ships thus ran according to the state of the tide, not to a fixed timetable. This was a factor in a serious accident at Staplehurst on 9 June 1865. The development of Dover Harbour

3472-638: Was reached, where a 100 ft (30 m) high viaduct was needed to cross the Foord Gap. A temporary station was provided at Folkestone, which opened on 28 June 1843. With the completion of the viaduct, Folkestone station opened on 18 December 1843. East of Folkestone, a hard gault ridge was bored through by the Martello Tunnel, which took its name from a nearby Martello Tower . Between Folkestone and Dover, there were three headlands, Abbott's Cliff, Round Down Cliff and Shakespeare's Cliff. The first and last were of sound chalk, but Round Down Cliff's chalk

3534-488: Was rebuilt to allow an increase of speed on the connecting lines from 30 miles per hour (48 km/h) to 50 miles per hour (80 km/h). Stage 2 extended electrification along the remainder of the SEML to Dover. Ashford, Shorncliffe and Folkestone Central stations were rebuilt. Colour light signalling was installed throughout, with new signal boxes being built at Hither Green, Chislehurst Junction, Orpington, Sevenoaks, Tonbridge, Ashford and Folkestone Junction. This allowed

3596-549: Was relegated to branch line status. In 1872, construction began on a branch line from Sandling to Sandgate , near Folkestone. Proposals to extend this, or to build a line from Shorncliffe which would have passed under the Foord Gap Viaduct, to Folkestone Harbour, were defeated by local opposition. Much of the land required was owned by the Earl of Radnor , who was opposed to the schemes. In 1881, powers were obtained to build

3658-581: Was sought in 1922 to build an electricity generating station at Charlton, London . This was refused by the Electricity Commissioners, who insisted that the company bought electricity from an existing supply company. Objections to this by the SECR were not entertained. On 1 January 1923, the SECR became part of the Southern Railway (SR). The SR decided that the electrification system was to be 660 V DC third rail . The first station on

3720-579: Was the premier of the Cinque Ports . As far back as the reign of Elizabeth I , there had been plans to build a breakwater at Dover. In 1836, a parliamentary inquiry was set up, and eventually construction of a breakwater was begun in 1847. The Admiralty Pier was to be wide enough for two railway lines to be accommodated. In use by 1864, the pier was completed in 1871. Another problem was a lack of decent hotel accommodation in Dover. The Harbour Commissioners had sold

3782-425: Was to be partly electrified as follows: Charing Cross and Cannon Street to Orpington as part of Stage 1; Orpington to Tonbridge as part of Stage 2, which also included the electrification of the former SEML between Redhill and Tonbridge. Both stages only covered the working of local passenger trains on the lines that were electrified. Stage 3 was to extend the working to through passenger trains and freight. Permission

SECTION 60

#1733084960207

3844-570: Was to make use of the existing London and Croydon Railway and London and Greenwich Railway companies' tracks. The SER did not have much spare capital. As a cost-cutting measure, authorisation was secured in 1837 to make the junction with the London and Croydon Railway at Norwood, Surrey . instead of at Corbett's Lane . However, the London and Brighton Railway was authorised to build from Norwood southwards in 1847. Parliament suggested that further savings could be made by avoiding having lines running in parallel valleys for 12 miles (19 km) if

#206793