Misplaced Pages

FTTS

Article snapshot taken from Wikipedia with creative commons attribution-sharealike license. Give it a read and then ask your questions in the chat. We can research this topic together.

The Future Tactical Truck System ( FTTS ) was a United States Armed Forces program for which the Operational Requirements Document was drawn up during 2003. FTTS was a proposed two vehicle modular family that was to replace the AM General High Mobility Multipurpose Wheeled Vehicle (HMMWV (the Humvee)) , Family of Medium Tactical Vehicles (FMTV), Oshkosh M977 Heavy Expanded Mobility Tactical Truck (HEMTT) , Palletized Load System (PLS) (in certain echelons), and all remaining M35 , M809 and M939 series of 2.5 and 5 ton trucks. The FTTS-UV (Utility Vehicle) was to replace the HMMWV , while the FTTS-MSV (Manoeuvre Sustainment Vehicle) was to replace all other types.

#128871

49-399: FTTTS may refer to: Future Tactical Truck System , canceled U.S. Army truck program ICAO airport code for Bousso Airport Topics referred to by the same term [REDACTED] This disambiguation page lists articles associated with the title FTTS . If an internal link led you here, you may wish to change the link to point directly to

98-475: A C-130 Hercules transport capability. Subject to load dimensions, all original FMTV variants are C-130 transportable at GVWR , and all models capable of being transported underslung by helicopter are fitted with a sliding outrigger system. Low Altitude Parachute Extraction System (LAPES), later revised to Low-Velocity Air Drop (LVAD) variants of A0 production LMTV (M1081 cargo) and MTV (M1093 cargo and M1094 dump) variants were produced. The chassis and cab of

147-500: A Parallel Hybrid Drivetrain and modular armor. It has undergone testing by 5th Brigade, 2nd Infantry Division and 14th Engineer Battalion at the Aberdeen Proving Grounds and Fort Lewis , along with Lockheed Martin 's design and Armor Holdings ' Maneuver Sustainment Vehicle. Family of Medium Tactical Vehicles The Family of Medium Tactical Vehicles ( FMTV ) are a series of military vehicles based upon

196-747: A 2004 EPA emissions compliant version of the same engine with the same power output. FMTV A1 variants have an earlier 1998 EPA emissions-compliant version of this engine, the 3126 ATAAC, which produced 275 hp at 2,400 rpm and 815 Lb.-Ft.torque at 1,600 rpm in LMTV variants, and 330 hp and 850 Lb.-Ft. torque in MTV variants. A 6.6-liter derivative of this engine, the 3116 ATAAC, was fitted to FMTV A0 models where it produced 225 hp and 735 Lb.-Ft. torque in LMTV variants, and 290 hp at 2,600 rpm and 860 Lb.-Ft. torque in MTV variants. The Allison 3070 SP seven-speed transmission fitted to A1P2 and A1R FMTVs evolved with

245-413: A U.S. Army Training and Doctrine Command ( TRADOC ) requirements document issued in 1983 for a Medium Tactical Truck (MTT), the intended replacement for the in-service 2.5-ton truck . In July 1984, a program to look at a future 5-ton truck procurement to replace in-service 2.5- and 5-ton trucks began. Cost analysis demonstrated that the procurement should be for both 2.5- and 5-ton trucks. In October 1984,

294-471: A common chassis , varying by payload and mission requirements. The FMTV is derived from the Austrian Steyr 12M18 truck, but substantially modified to meet United States Army requirements. These include a minimum 50 percent U.S. content. There were originally 17 FMTV variants—four variants in the nominal 2.5 U.S. ton payload class, designated Light Medium Tactical Vehicle (LMTV), and 13 variants with

343-462: A five-year ordering period, plus two additional one-year options. The estimated date of completion has previously been quoted as February 2022. Both Oshkosh and AM General submitted bids for the requirement. Following the FMTV A2 award, Oshkosh initially built and delivered vehicles in support of Production Verification Testing (PVT), Live Fire Testing (LFT) and logistics development. In August 2021, it

392-561: A further 354 FMTV A1P2 trucks and trailers, at a value of $ 75 million. By February 2019, Oshkosh had delivered more than 38,100 FMTVs since the award of the FMTV A1P2 contract. In June 2019, the US Department of Defence awarded Oshkosh a $ 320,000,000 modification to domestic and Foreign Military Sales (Argentina, Djibouti, Iraq, Lebanon, Romania) contract, for procurement of Family of Medium Tactical Vehicle variants. The estimated completion date

441-569: A move away from previous United States Army designs, a cab over engine (COE) design was selected for the FMTV, as while the US Army did not specify this configuration, given the Cold War situation prevailing at the time it had indicated that overall length for shipboard transport was a consideration. On a model-for-model basis the FMTV is around 3 ft. shorter than its bonneted predecessors, while retaining

490-518: A nominal 5 U.S. ton payload rating, called Medium Tactical Vehicle (MTV). Since the first FMTVs were fielded in January 1996, the family has been expanded and the overall design enhanced considerably. The FMTV was originally manufactured by Stewart & Stevenson (1996–2006), then by Armor Holdings (2006–2007), next by BAE Systems Platforms & Services. Since 2011 it has been manufactured by Oshkosh Corporation . The FMTV's origins trace back to

539-472: A remove and replace operation. To meet the US Army's current Long Term Armor Strategy (LTAS) for armored cabs, BAE Systems developed the LTAS cab for the FMTV. BAE Systems produced over 9,000 LTAS cabs for the FMTV A1P2 variant. All Oshkosh FMTV vehicles include the company's own LTAS-compliant armor solution. The LTAS is based around the A and B kit principles, allowing for vehicles to be armored as required, with

SECTION 10

#1733085946129

588-566: A small number of armor B-kits. BAE Systems and legacy companies delivered around 74,000 FMTV trucks and trailers to the United States Army. In March 2012, U.S. budgetary projections suggested that due to funding constraints, the FMTV program would be terminated in FY14 . Under the FMTV contract, orders could be placed until December 2013, with first deliveries to commence within one year of that, with final deliveries one year later. In October 2016,

637-534: Is August 2021. In August 2021, Oshkosh confirmed that the company had produced over 40,500 A1P2 trucks and trailers. FMTVs are currently being reset at the Red River Army Depot on return from deployed operations. Current projections are for a recapitalization program to begin in 2020/2021. The 2.5-ton (4×4) FMTV is designated as the Light Medium Tactical Vehicle (LMTV). The 5-ton (6×6)

686-453: Is by a combination of parabolic tapered leaf springs, inverted on the MTV rear bogie, shock absorbers, and an anti-roll bar for the rear axle/bogie. Two cargo trailers are part of the Family of Medium Tactical Vehicles (FMTV). The M1082 single-axle trailer is used with the LMTV cargo truck. The M1095 twin-axle trailer is used with the MTV cargo truck. Both trailers have payloads that match that of

735-572: Is designated the Medium Tactical Vehicle (MTV). The FMTV is based on the Austrian Steyr 12 M 18 (4×4) truck , but has been localized to meet a minimum of 50% US content. The original 15 FMTV prototypes were assembled in Austria . Based on the 12 M 18 chassis-cab, they were fitted with a number of US-supplied/specification components, including a Caterpillar diesel engine, Allison automatic transmission and Meritor drive axles. In

784-483: Is sourced from Sweden . LMTV variants can be fitted with a DP-10J winch with an 11,000 lb. line pull. MTV variants use a DP-515 winch with a 15,500 lbs. line pull. Current production FMTV A1P2s are powered by a 2007 Environmental Protection Agency (EPA) emissions-compliant 7.2-liter six-cylinder Caterpillar C7 diesel engine , producing 275 hp and 860 Lb.-Ft. torque in LMTV variants and 330 hp and 860 Lb-Ft. torque in MTV variants. FMTV A1Rs have

833-669: The Future Tactical Truck System (FTTS) would eventually replace virtually all of its tactical wheeled vehicle fleet, including the FMTV. The FTTS never materialized. However, along with inputs from other efforts, the FTTS continues to be used to define requirements for future United States Army trucks. With the FTTS already faltering, BAE Systems was awarded a bridging contract in June 2008, for up to 10,000 FMTVs or trailers. The contract including an option for 10,000 additional vehicles, which

882-739: The JLTV Initial Capabilities Document by the Secretary of Defense], the Future Tactical Truck Systems Advanced Concept Technology Demonstration, the PSD [Platform Systems Demonstration], EMIP [Expedited Modernization Initiative Procedure] and various Office of Naval Research Science and Technology activities will inform the requirements process, thus ensuring requirements are realistic, achievable and relevant to all services. Deliveries of

931-506: The Army would be seeking a new medium truck family in the mid-2020s. In October 2016 the U.S. Army solicited proposals for the FMTV A2 rebuy competition. The FMTV A2 request for proposals (RfP) stated the program would seek "to integrate higher capacity suspension, wheels, and tires; integrate underbody protection; increase engine power; integrate higher capacity alternator; integrate data bus upgrade; and integrate safety enhancements". The winner of

980-545: The BMY Wheeled Vehicle Division of the Harsco Corporation, and Teledyne Continental Motors , for 15 prototype vehicles each, to be completed by January 1989. In October 1991 a five-year FMTV contract was awarded to Stewart & Stevenson. The initial contract order total was expected to be 20,000 vehicles. This was reduced to 10,843 vehicles, and valued at US$ 1.2 billion. Some options were added, raising

1029-602: The FMTV A1 CR, designated FMTV A1R, began in Q3 2004. Improvements to A1R models were numerous, and included a new EPA 2004 compliant Caterpillar C7 engine. A total of 21,149 FMTVs and companion trailers were built under the FMTV A1R contract award. In May 2006, Stewart & Stevenson was acquired by Armor Holdings Inc. In August 2007, Armor Holdings was acquired by BAE Systems . The United States Army had intended that two variants of

SECTION 20

#1733085946129

1078-404: The FMTV A1P2 contract to August 2019. This contract extension will close out production of the FMTV A1P2. On 21 September 2017, an order for 1,065 FMTVs at a value of $ 260.1 million under Order Year 8 of the latest contract extension was announced. On 27 September a further two Order Year 8 orders for a total of 148 FMTVs valued at more than $ 36 million was announced, with Oshkosh confirming that

1127-514: The FMTV contract was extended from September 2016 to August 2019, allowing for the continued procurement of FMTV A1P2s. One day earlier, the U.S. Army solicited proposals for the FMTV A2 rebuy competition. In January 2017, Israel's Ministry of Defense ordered 200 FMTVs from Oshkosh, in a contract valued at $ 200 million. Deliveries were expected to start tin 2017 and conclude in mid-2018. The MoD noted that additional orders are likely. At this time Oshkosh confirmed that since deliveries started in 2010,

1176-529: The FMTV feature extensive corrosion protection. It was the first truck to pass the United States Army's 22-year accelerated corrosion test. The design of the FMTV has never remained static and to further increase reliability, user-friendliness, and operational flexibility, detailed refinements/upgrades have continued throughout FMTVs production run. The FMTV is built around a conventional bolted / huck-bolted, cold-formed C-section chassis , with bolted-in tubular cross-members. The high-grade 758 MPa steel used

1225-530: The FMTV formally began as a program. The request for proposals (RFP) for FMTV was released in 1988. At this time it was expected that around 120,000 trucks would be ordered, over three five-year contracts. In October 1988, the United States Army awarded contracts to Stewart & Stevenson , the Tactical Truck Corporation, a 50/50 joint venture between General Motors Military Vehicles and

1274-406: The FMTV, its A1 designation being MD 3070 PT, its A0 designation being MD-D7. This has an integral single-speed transfer case. All-wheel drive is full-time, with a 30/70 percent front/rear torque split for on-road driving, and a 50/50 percent split for off-road driving. All FMTV models are fitted with Meritor beam axles, with ratings and specifications evolving as the FMTV has developed. Suspension

1323-448: The M&;S contractors to manufacture prototype designs: two contractors to produce their UV version with trailer, and one contractor to produce two MSVs with companion trailers. All vehicles and trailers were to be evaluated in a Military Utility Assessment (MUA) at Fort Lewis , Washington. The MUA was scheduled to occur during the first and second quarters of FY07, with the results to fed into

1372-455: The RfP "includes an estimated quantity of approximately 2,400 new production vehicles. However, the actual quantities in any future award are undetermined and will depend on proposed pricing for this quantity, army requirements, and available funding." In May 2017, Oshkosh submitted a proposal in response to the RfP for the Family of Medium Tactical Vehicles (FMTV) A2 production effort. At this point,

1421-408: The U.S. Army anticipated a contract award announcement in the second quarter of fiscal year 2018 and stated that the next generation FMTV A2 would comprise 16 models and three trailers. In February 2018, the Army selected Oshkosh to build to FMTV A2. The initial estimated contract value is $ 476.2 million, with no cap on the number of vehicles the Army may purchase. The firm fixed price contract covers

1470-886: The U.S. Army's Tank-automotive and Armaments Command refereed the Future Tactical Truck Systems - Advanced Concepts and Technology Demonstration (ACTD) program. Navistar International and Lockheed Martin 's proposals, the International FTTS and Lockheed FTTS Utility Vehicles were selected, as well as the Armor Holdings proposal for the MSV. In August 2006 they were tested at the Aberdeen Proving Grounds . Following this evaluation they were parked in The Pentagon courtyard for evaluation by higher-ranking military officials." International Truck 's proposal for FTTS utilized

1519-774: The United Arab Emirates (UAE). In 2008, BAE Systems unveiled the Caiman Light (CLT), a five-man 4×4 version of the Caiman. To meet the Iraqi Light Armored Vehicle Requirement (ILAV), BAE Systems offered a fully armored LMTV on which the LSAC cab was extended rearwards, into a troop carrying body. Neither of these proposals entered production. Early in 2014, the U.S. Army's Program Executive Officer for Combat Support and Combat Service Support (CS CSS) suggested that

FTTS - Misplaced Pages Continue

1568-514: The United States Army (July 2006) "Army Tactical Wheeled Vehicle Strategy: Meeting Current and Future Needs" pdf stated that the ACTD for FTTS was taking a two phase approach; the first phase involved modeling and simulation (M&S) efforts in which multiple vendors presented concepts for technologies to be incorporated into designs for the UV and MSV variants of FTTS. The second phase included awards to three of

1617-449: The add-on applique package adaptable to prevailing threats and upgradeable as new armoring technologies emerge. The A-Kit, which includes a new cab, modifies the FMTV to allow the addition of armour. The B-Kit is the bulk of the armor itself. The Caiman Mine Resistant Ambush Protected ( MRAP ) vehicle is based on the MTV A1R platform. The United States Marines placed an initial order with

1666-474: The company had delivered more than 36,200 FMTV trucks and trailers. In November 2017, Oshkosh announced the delivery of the 25,000th FMTV truck to the US Army. In June 2018, Oshkosh announced that the U.S. Army Contracting Command had placed four additional orders, for a total of 771 FMTV A1P2s, valued at $ 159.6 million. In February 2019, the U.S. Army Tank-automotive and Armaments Command (TACOM) Life Cycle Management Command (LCMC) placed orders with Oshkosh for

1715-399: The company had received orders for over 24,500 FMTV trucks and 11,400 FMTV trailers. On 21 September 2017, the U.S. Army made an administrative modification to the FMTV A1P2 requirements contract with Oshkosh, to establish the eighth, ninth and tenth Order Years' pricing under the contract, at an estimated value of $ 466 million. This administrative modification authorizes future orders under

1764-403: The contract would be asked to integrate such upgrades; build the vehicles, trailers, and kits; and provide program, maintenance, and logistics support. According to the RfP, the FMTV A2 contract is expected to cover five ordering years with two additional one-year option periods for a potential total of 2,400 vehicles if all options are exercise. In a subsequent statement, an Army spokesman said

1813-576: The intended article. Retrieved from " https://en.wikipedia.org/w/index.php?title=FTTS&oldid=1225396238 " Category : Disambiguation pages Hidden categories: Short description is different from Wikidata All article disambiguation pages All disambiguation pages Future Tactical Truck System By 2006 work on FTTS was faltering and according to the foreword of Jane's Military Vehicles and Logistics 2006-2007 by Shaun C Connors and Christopher F Foss ( ISBN   978-0710627612 ): "The U.S. Army’s original intention

1862-598: The introduction of ABS braking . In July 2000, the first A1 models were fielded . In April 2001, Stewart & Stevenson and Oshkosh Truck Corporation were awarded contracts for the Evaluation Phase (Phase 1) of the FMTV A1 Competitive Rebuy (FMTV A1 CR) program for the next FMTV production contract. Following trials and evaluation, in April 2003 the contract was awarded to Stewart & Stevenson. Production of

1911-456: The medium and heavy category trucks in production when FTTS commenced, and to be replaced by FTTS, continue. The FMTV (now with Oshkosh ) production contract has recently been extended to September 2016, and award of the Family of Heavy Tactical Vehicles IV (FHTV) contract, on a sole source basis to Oshkosh , is anticipated in the near future. FHTV contract awards include HEMTT and PLS . To evaluate possible future truck systems and designs,

1960-507: The requirements development process, this to define future truck requirements. Elements of FTTS-UV ACTD were fed in to the ongoing Joint Light Tactical Vehicle (JLTV) program, this the replacement for part of the HMMWV fleet. On 24 April 2006, establishment of a Joint Program Office to manage the JLTV effort was endorsed. The AUSA pdf file previously referenced stated that: "Following approval, [of

2009-940: The then Armor Holdings for 1,170 Caiman in July 2007. 2,868 Caiman were ordered, with deliveries completed in November 2008. In winter 2010, BAE Systems unveiled the Caiman MultiTerrain Vehicle (MTV) at AUSA . The Caiman MTV is a modified version of the base Caiman, that features a revised driveline, a new chassis and upgraded fully independent suspension. BAE Systems received contracts to upgrade 2,071 (1,700 + 371) Caiman to Caiman MTV standard. These upgrades were completed in Q1/Q2 2014. Post-Afghanistan, no Caiman MRAPs have been retained by U.S. armed forces. Some have been transferred to U.S. law enforcement agencies. Others have been offered as Excess Defense Articles (EDA) to Iraq, Jordan, Nigeria and

FTTS - Misplaced Pages Continue

2058-501: The total to 11,197 vehicles over seven contract years. In January 1996, the first FMTVs were fielded. In October 1998, Stewart & Stevenson was awarded the second FMTV contract, for 8,000 trucks and 1,500 companion trailers, for $ 1.4 billion. Total quantities including options were 11,491 trucks and 2,292 trailers, delivered between September 1999 and October 2004. Trucks were the improved A1 model, with improvements including an uprated engine (1998 EPA compliant) and transmission, and

2107-423: The towing truck, and they share many components, including axles, with the towing truck. (sequenced by U.S. Army M number) Current and recent operational scenarios call for logistic trucks of the FMTV type to have at least the option of cab armoring. When it entered production, armoring was not considered an option for the FMTV. The first protection solution for the FMTV was not in answer to such scenarios, but

2156-489: Was announced by Oshkosh that the Army's Tank-Automotive and Armaments Command (TACOM) Life Cycle Management Command (LCMC) had awarded the company a $ 152 million delivery order for 541 FMTV A2. The Army is expected to begin fielding the A2 FMTV variant in June 2023. FMTV A2 variants are: (Production FMTVs are presented in U.S. Army M number sequence) Specific details of FMTV export orders are seldom officially announced, with

2205-491: Was awarded a $ 16.3 million contract to provide 272 armor protection kits for the FMTV. 1,862 kits were produced. These kits were based around ballistic-protection panels installed on standard FMTV cabs. In answer to demands for greater crew protection, BAE Systems developed the Low Signature Armored Cab (LSAC) for all variants of the FMTV. The LSAC replaced the standard FMTV cab, with which it shares internals, in

2254-457: Was awarded as a five-year 'build-to-print' requirements-type award, that at award, allowed the U.S. government to order from 0 up to 12,415 trucks and 10,926 trailers to 2014. Some FMTV variants were excluded from the rebuy competition. Those excluded include specialist FMTV variants such as HIMARS , Patriot , MEADS and LVAD, plus all the armored cabs developed by BAE Systems. In February 2012, all FMTV work with BAE Systems had concluded, minus

2303-669: Was developed by Stewart & Stevenson and O'Gara-Hess & Eisenhardt Armoring Company (OHE). Called the Crew Protected Cab, it was specifically for the HIMARS variant and offered flash and Foreign Object Debris (FOD) protection during launch. Designs followed for an Enhanced Crew Protected Cab, and later an Armor Protected Cab, each adding more ballistic capability against direct fire, artillery burst and mines. To meet emerging threats on deployed operations, in March 2004 DRS Technical Services

2352-460: Was exercised. In May 2009, BAE Systems, Navistar Defense and Oshkosh Defense each submitted proposals for the FMTV A1P2 competitive rebuy program to the U.S. Army's Tank-Automotive and Armaments Command ( TACOM ) Life Cycle Management Command. In August 2009, the United States Army announced that Oshkosh Defense had been awarded the FMTV A1P2 rebuy production contract. The award was protested by both BAE Systems and Navistar. The FMTV A1P2 rebuy

2401-487: Was that the FTTS (the logistic support for the Future Combat System (FCS)) with just two variants would eventually replace virtually all of the current tactical wheeled vehicle fleet. In a more realistic approach, the current FTTS-MSV/UV Advanced Concept Technology Demonstration (ACTD) efforts (with input from other efforts) will now be used ‘to define requirements’ for future U.S. Army trucks." The Association of

#128871