104-516: Darlington railway station is a principal stop on the East Coast Main Line , serving the town of Darlington in County Durham , England. It is 232 miles 50 chains (232.63 miles; 374.37 kilometres) north of London King's Cross . It is situated between Northallerton to the south and Durham to the north. Its three-letter station code is DAR. The station is well served, since it
208-418: A change in government in 2010 and the 2008 financial crisis , the project was ultimately shelved. Several stations eventually got their improvements and there is a possibility of improved rollingstock and services in the future which may affect Darlington. The station is fully staffed; the ticket office is open throughout the week (06:00–20:00/21:00 weekdays, 06:30–19:45 Saturdays, 07:45–20:00 Sundays). There
312-480: A 'spine' for several diverging branches, serving destinations such as Cambridge , Leeds , Hull , Sunderland and Lincoln , all with direct services to London. In addition, a few ECML services extend beyond Edinburgh to serve other Scottish destinations, such as Stirling , Inverness , Aberdeen or Glasgow Central , although the principal London-Glasgow route is the West Coast Main Line (WCML). The line
416-521: A contactless debit/credit card. Contactless also covers some areas that Oyster doesn't such as the Elizabeth line to Reading, or the Thameslink station at Oakleigh Park. The most common types of tickets available include 'advance' tickets, that specify a specific route and timing between two destinations, 'off-peak' tickets, either as a single or a return, that allow a passenger to use a train at hours where
520-436: A different system. National Rail services share a ticketing structure and inter-availability that generally do not extend to services which were not part of British Rail. National Rail should not be confused with Network Rail . National Rail is a brand used to promote passenger railway services, and providing some harmonisation for passengers in ticketing, while Network Rail is the organisation which owns and manages most of
624-473: A minor overrun against its authorised expenditure of £331.9 million. Of the total cost, 60 per cent was for the electrification process itself, while the remaining 40 per cent covered rolling stock, including the new InterCity 225 trains procured specially for the route. These were introduced in 1989 to operate express services. They were developed by the General Electric Company (GEC), as
728-444: A new connecting line from the south end of the station ( Polam Junction ) to meet the original S&D line towards Middlesbrough at Oak Tree Junction near Dinsdale . These improvements were completed on 1 July 1887, when the old route west of Oak Tree closed to passengers; it remained in use for freight until 1967. The new station, with its broad island platform , was designed by T. E. Harrison, chief engineer, and William Bell,
832-570: A number of technical manuals on which travel on the railways in Great Britain is based, such as the National Rail Conditions of Travel , via their website. Pocket timetables for individual operators or routes are available free at staffed stations. The last official printed timetable with up to 3000 pages was published in 2007. Now the only complete print edition is published by Middleton Press (as of October 2016). A digital version of
936-530: A photo booth, payphone and cash machines are also provided. Train running information is offered via digital CIS displays, announcements and timetable posters. Step-free access to all platforms is via ramps from the subway, linking the platforms with the main entrance and car park. Darlington is well served by trains on the East Coast Main Line ; it is served by four train operating companies : Darlington railway station has five main platforms: HS2 trains were originally planned to stop at Darlington as part of
1040-617: A powerful high-speed locomotive developed and built by English Electric . The prototype was successful and a fleet of 22 locomotives were built and put into BR service for express traffic. Designated Class 55 , they were powered by a pair of Napier Deltic engines that had been developed for fast torpedo boats. The Class 55 'Deltics' were for a time the fastest and most powerful diesel locomotives in service in Britain, capable of reaching 100 mph (160 km/h) and providing up to 3,300 hp (2,500 kW). When introduced into service in 1961,
1144-535: A southbound run from Darlington to York. At least two other trains have subsequently recorded higher speeds, but as of February 2023 the InterCity 125 record remains the highest to have been officially verified. A British speed record for electric locomotives of 161.7 mph (260.2 km/h) was achieved on 17 September 1989, also at Stoke Bank, by Class 91 locomotive number 91010. On 26 September 1991, an InterCity 225 shortened electric locomotive train
SECTION 10
#17328691991671248-544: A successor to the Deltics, the InterCity 125 High Speed Train (HST) between 1978 and 1979. These could reach speeds up to 125 mph (201 km/h) on existing infrastructure, bringing the fastest London–Edinburgh timing down by another hour, to 4 + 1 ⁄ 2 hours. They operated most express passenger services on the line until electrification was completed in 1991, after which they continued in use on services that run off
1352-426: A valid ticket boarding a train at a station where ticket-buying facilities are available are required to pay the full Open Single or Return fare. On some services penalty fares apply – a ticketless passenger may be charged the greater of £20 or twice the full single fare to the next stop. Penalty Fares can be collected only by authorised Revenue Protection Inspectors, not by ordinary Guards. National Rail distributes
1456-575: Is London North Eastern Railway , but open-access competition on services to Northern England and Scotland is provided by Hull Trains , Grand Central and Lumo . The ECML is part of Network Rail 's Strategic Route G, which comprises five separate lines: The core route is the main line between King's Cross and Edinburgh, the Hertford Loop is used for local and freight services, and the Northern City Line provides an inner-suburban service to
1560-469: Is a 393-mile long (632 km) electrified railway between its northern terminus at Edinburgh Waverley and southern terminus at London King's Cross station . The key towns and cities of Peterborough , Doncaster , York , Darlington , Durham and Newcastle are on the line. The line is a key transport artery on the eastern side of Great Britain running broadly parallel to the A1 road . The main line acts as
1664-422: Is a waiting room and a first class lounge on the platform, with the lounge open between 06:00 and 20:00 each day; on Sundays, it opens at 08:00. Self-service ticket machines are also provided for use outside the opening hours for the booking office and for collecting pre-paid tickets. Various retail outlets are located in the main buildings, including a coffee shop, grocers and newsagents. Vending machines, toilets,
1768-491: Is an important stop for main line services, with trains operated by London North Eastern Railway , CrossCountry and TransPennine Express ; it is also the interchange for Northern Trains services to Bishop Auckland , Middlesbrough and Saltburn . Darlington is the location of the first commercial steam railway, the Stockton and Darlington Railway . The station building is a Grade II* listed Victorian structure and winner of
1872-761: Is carried along its route by several bridges and viaducts which are recognised as architecturally significant listed structures ; the longest of which is the 659-metre-long (2,162 ft) Royal Border Bridge at Berwick-upon-Tweed . Others include Digswell Viaduct , near Welwyn Garden City , at 475 m (1,558 ft), the Ouseburn Viaduct in Newcastle at 280 m (920 ft), Durham Viaduct at 240 m (790 ft), and Chester Burn Viaduct in Chester-le-Street at 230 m (750 ft). The 350-metre-long (1,150 ft) King Edward VII Bridge in Newcastle
1976-492: Is currently limiting speeds to 125 mph. There are currently no plans to retrofit ERTMS equipment to the InterCity 225 fleet, as they are expected to be withdrawn before the removal of the lineside signals; this means they will never reach their design speed of 140 mph (225 km/h) in service. The line is mainly quadruple track from London to Stoke Tunnel, south of Grantham , with two double track sections: one between Digswell Jn & Woolmer Green Jn, where
2080-503: Is on fairly straight track on the flatter, eastern side of England, through Lincolnshire and Cambridgeshire , though there are significant speed restrictions because of the line's curvature particularly north of Darlington and between Doncaster and Leeds. By contrast, the West Coast Main Line crosses the Trent Valley and the mountains of Cumbria , with more curvature and had a lower speed limit of 110 mph (180 km/h). Speeds on
2184-600: Is the trading name licensed for use by the Rail Delivery Group , an unincorporated association whose membership consists of the passenger train operating companies (TOCs) of England , Scotland , and Wales . The TOCs run the passenger services previously provided by the British Railways Board , from 1965 using the brand name British Rail . Northern Ireland , which is bordered by the Republic of Ireland , has
SECTION 20
#17328691991672288-479: Is the UK's largest and most accurate travel information website, peaking at more than 10 million visitors per day, more than its nearest competitors. The National Rail website includes a journey planner , fare and live departure information. The site is designed to complement the myriad different websites of Britain's privatised rail companies, so when users have selected which tickets they wish to buy, they are redirected to
2392-544: Is the joint responsibility of the Office of Rail and Road (allocation of paths) and Network Rail (timetable production and publication). Since March 2020 all ticket revenue has been collected by the Department for Transport, which also pays the operators' costs. Following the privatisation of British Rail there was no longer a single approach to railway corporate design. The look and feel of signage, liveries and marketing material
2496-563: The Elizabeth line (formerly TfL Rail ) are hybrids: Their services are operated via a concession awarded by Transport for London (TfL). They are part of National Rail as train operating companies , where tickets can be used in the same way as other operators, and shown in the National Rail timetable. However, under Transport for London, they are considered as separate networks. They are listed separately in all materials produced by TfL than National Rail, stations serving London Overground or
2600-411: The Elizabeth line only do not have the National Rail logo shown on either the station themselves or the tube map, and fares on these two networks are priced as TfL services, the same as London Underground , rather than National Rail services. The National Rail service status web page by TfL also does not list these two systems. London Overground also owns some infrastructure in its own right, following
2704-612: The Large Station of the Year award in 2005. The first railway to pass through the area now occupied by the station was built by the Stockton and Darlington Railway , which opened their mineral branch from Albert Hill Junction on their main line to Croft-on-Tees on 27 October 1829. This branch line was subsequently purchased by the Great North of England Railway a decade later to incorporate into their new main line from York , which reached
2808-552: The Leeds - Hull line direct to York . Through journeys were important and lucrative for the companies and in 1860 they built special rolling stock for the line. Services were operated using "East Coast Joint Stock" until 1922. The trains were hauled by GNR locomotives between King's Cross and York, which entailed utilisation of GNR running powers over the NER between Shaftholme Junction and York (which had been agreed in 1849 and exercised from
2912-582: The London Underground uses its own tracks in the majority of its network, it also runs on Network Rail tracks and shares tracks with National Rail services, both on its own tracks and on Network Rail tracks. Twenty-five privately owned train operating companies were each franchised for a defined term by government in 1996–97. They operated passenger trains in Great Britain. However, franchises have ceased to exist and are being replaced by operating contracts, which do not involve significant commercial risk for
3016-497: The London Underground , Docklands Light Railway , London Tramlink , Blackpool Tramway , Glasgow Subway , Tyne and Wear Metro , Manchester Metrolink , Sheffield Supertram , West Midlands Metro and Nottingham Express Transit . On the other hand, the largely self-contained Merseyrail system is part of the National Rail network, and urban rail networks around Birmingham , Cardiff , Glasgow and West Yorkshire consist entirely of National Rail services. London Overground and
3120-508: The Northern City Line to Moorgate . In the late 1970s, a working group of British Rail and Department for Transport officials convened and determined that, of all options for further electrification, the ECML represented the best value by far. Its in-house forecasts determined that increases in revenue and considerable reductions in energy and maintenance costs would occur by electrifying
3224-753: The Sky Express bus service to Durham Tees Valley Airport from the station, but this was withdrawn in January 2009 due to declining demand. Starting in 2006, Darlington was mentioned within the Tees Valley Metro scheme. This was a plan to upgrade the Tees Valley Line and sections of the Esk Valley Line and Durham Coast Line to provide a faster and more frequent service across the North East of England . In
Darlington railway station - Misplaced Pages Continue
3328-521: The West Coast Main Line (WCML) were increased with the introduction of tilting Pendolino trains and now match the 125 mph speeds on the ECML. The line's current principal operator is London North Eastern Railway (LNER), whose services include regular long-distance expresses between King's Cross, the East Midlands, Yorkshire, the North East of England and Scotland. LNER is operated on behalf of
3432-452: The 14-mile-long (23 km) Selby Diversion . Construction commenced in 1980, and was completed in late 1983 at a cost of £63 million (equivalent to £214 million in 2023). The new section diverged from the original alignment at Temple Hirst Junction, north of Doncaster, bypassed Selby station and the area to be undermined by coal workings, and then joined the Leeds–York line of
3536-466: The Class 55's ability to rapidly accelerate and maintain high speed with a heavy train over long distances, immediately cut over one hour from the standard London to Edinburgh journey time, from seven hours to under six. Further improvements to the infrastructure meant that by the mid-1970s, another half-hour had been cut from the journey time. In the years following the introduction of the Deltics, sections of
3640-476: The Deltic and High Speed Train, as an interim measure to implement improved services, whilst West Coast electrification proceeded, and was largely complete by 1974. During the period when Richard Beeching was chairman of British Rail, WCML electrification with a spur from Carstairs to Edinburgh was seen as possible justification for the truncation of the ECML at Newcastle. British Rail carried out electrification of
3744-671: The Department for Transport by a consortium of Arup Group , Ernst & Young and SNC-Lavalin Rail & Transit , which took over from Virgin Trains East Coast on 24 June 2018. Other operators of passenger trains on the line are: Eurostar previously held the rights to run five trains a day on the line for services from mainland Europe to cities north of London, as part of the Regional Eurostar plan, which never came to fruition. The overnight Caledonian Sleeper occasionally uses
3848-440: The ECML and onto non-electrified lines. Generally popular with the public, and considered by some to be iconic, they ran on the ECML for 41 years, before being withdrawn in 2019. In 1973, the prototype HST British Rail Class 41 recorded a top speed of 143 mph (230 km/h) in a test run on the line. There had been proposals to electrify all or parts of the ECML as far back as the early 1900s, but no significant scheme
3952-460: The ECML were upgraded for trains running at speeds of up to 100 mph (160 km/h). On 15 June 1965, the first length of high-speed line, a 17 miles (27 km) stretch between Peterborough and Grantham, was completed. The next section was 12 miles (19 km) of line between Grantham and Newark and more sections were upgraded to enable high speeds along much of the line. Continuing demand for reduced journey times led British Rail to introduce
4056-534: The ECML when engineering works prevent it from using its normal train path on the WCML. DB Cargo UK , Direct Rail Services , Freightliner and GB Railfreight operate freight services. The ECML is one of the busiest lines on the British rail network and there is insufficient capacity on parts of the line to satisfy all the requirements of both passenger and freight operators. National Rail National Rail ( NR )
4160-465: The ECML. British Rail 's 1955 modernisation plan placed equal importance on electrification of both the West Coast Main Line (WCML) and ECML; a detailed plan drawn up in 1957 gave a completion date of 1970 for ECML electrification. However, the East Coast authorities decided that they could not wait over a decade for service improvements, and instead decided to invest in high-speed diesel traction,
4264-500: The LMS countered with its own streamlined Coronation Class – both of which were capable of reaching speeds in excess of 100 mph (160 km/h). The competition was curtailed soon thereafter by the coming of World War II . In the aftermath of the war, Clement Attlee 's Labour Government nationalised the LNER and the other three major railway companies in Great Britain with
Darlington railway station - Misplaced Pages Continue
4368-526: The NER at Askern , famously described by the GNR's chairman as in "a ploughed field four miles north of Doncaster". Askern was connected to the Lancashire and Yorkshire Railway , a short section of which was used to reach the NER at Knottingley . In 1871, the line was shortened when the NER opened a direct line from an end-on junction, with the GNR, at Shaftholme, just south of Askern to Selby and over Selby Bridge on
4472-474: The National Rail logotype and is displayed on tickets, the National Rail website and other publicity. The trademark rights to the double arrow symbol remain state-owned, being vested in the Secretary of State for Transport . The double arrow symbol is also a generic symbol for a railway station across Great Britain, and is used to indicate a railway station on British traffic signs. The National Rail (NR) logo
4576-417: The National Rail network and mostly operate for heritage or pleasure purposes rather than as public transport, but some have connections to National Rail track. National Rail services have a common ticketing structure inherited from British Rail . Through tickets are available between any pair of stations on the network, and can be bought from any station ticket office. Most tickets are inter-available between
4680-577: The North and Midlands stated that the linespeed would be upgraded to 140 mph (225 km/h). The line links London, South East England , East Anglia and the East Midlands , with Yorkshire , the North East and Scotland, and is important to their local economies. It carries commuter traffic in north London as well as cross-country, commuter and local passenger services, and freight . In 1997, operations were privatised. The primary long-distance operator
4784-595: The WCML from the south. In total the electrification programme covered roughly 1,400 single-track miles (2,300 km) and required major infrastructure changes, including resignalling of the line from Temple Hirst Junction (near Selby in Yorkshire) to the Scottish border; the construction of new signalling centres at Niddrie, York, and Newcastle; the commissioning of ten new connections to the national electricity grid; and structure clearance and electrical immunisation works along
4888-700: The Widened Lines route and the GWML, where ERTMS complements traditional lineside signals, the southern ECML will have its signals removed once the transition period to ERTMS is complete. This means that all trains running on the route will be required to be fitted with the appropriate onboard equipment. The Class 800 series (LNER Azuma Classes 800 and 801 , Hull Trains Paragon Class 802 , Lumo Class 803 ), Thameslink Class 700 and Great Northern Class 717 fleets are fitted with ERTMS equipment from manufacture. The Great Northern Class 387 fleet are undergoing retrofit, with
4992-443: The architect of the NER. It cost £81,000 (equivalent to £11,380,000 in 2023) to construct. It soon became a busy interchange on the main East Coast route, thanks to its rail links to Richmond (opened in 1846), Barnard Castle and Penrith (1862/5) and the Tees Valley Line to Bishop Auckland (1842) and Saltburn (1861). The lines to Penrith (closed in 1962), Barnard Castle (1964) and Richmond (1969) have now gone, along with
5096-517: The bays at the northern end of the station which are now used for car parking. The main line, which was electrified in 1991, and the Tees Valley route remain busy. It is also still possible to travel to Catterick Garrison and Richmond from here, by means of the Arriva North East -operated X26 and X27 buses, which have through National Rail ticketing arrangements. The same company also operated
5200-497: The city. The line has engineers line references (ELR) ECM1 to ECM9. The ECML was constructed by three independent railway companies. During the 1830s and 1840s, each company built part of the route to serve its own area, but also intending to link with other railways to form the through route that would become the East Coast Main Line. From north to south, the companies were: The GNR established an end-on connection with
5304-424: The company experienced financial difficulties; the franchise then passed to National Express East Coast until in 2009, when it too encountered financial problems and the government was forced to run the franchise itself as ' East Coast '. Another attempt at returning the franchise to private-sector operation was made by Virgin Trains East Coast in 2015, but this failed in 2018, and thus since then it has been run by
SECTION 50
#17328691991675408-400: The crossing with a flyover or tunnel, which would increase capacity on both lines, have been proposed on several occasions but are complicated by costs and spatial constraints at the site. With most of the line rated for 125 mph (200 km/h) operation, the ECML was the fastest main line in the UK until the opening of High Speed 1 . The high speeds are possible because much of the line
5512-419: The demand for higher speed, British Rail introduced InterCity 125 high-speed trains between 1976 and 1981. In 1973, a Class 41 (an HST prototype) achieved a top speed of 143 mph (230 km/h) in a test run. In the 1980s, the line was electrified and InterCity 225 trains introduced. These have in turn been largely replaced by Class 800 and Class 801 units. The November 2021 Integrated Rail Plan for
5616-611: The eastern leg, but phase 2b was cancelled as part of the Integrated Rail Plan ; the entirety of the second phase of HS2 was cancelled in 2023. As at 2024, the station is undergoing redevelopment with many features of the abandoned Tees Valley Metro plan being resurrected. There is the construction of a new concourse, multi-storey car park and two new platforms on the current freight avoiding lines. East Coast Main Line The East Coast Main Line ( ECML )
5720-516: The fifth aspect was not removed from signals in the test area , and the relevant track Sectional Appendix continued to list the capability to run special test trains in excess of 125 mph as recently as 2008. As part of the privatisation of British Rail in the mid-1990s, passenger operations on the ECML were offered to bidders as the InterCity East Coast franchise. It was held by Great North Eastern Railway from 1996 until 2007, when
5824-564: The first train sent to Worksop Depot in October 2022. Following its return to service in July 2023, the remaining trains will be retrofitted in Hornsey Depot. The introduction of in-cab signaling will allow the ECML line speed to be increased to 140 mph in some places. The Class 800 series trains were designed to reach this speed, but minor modifications will be required to remove the equipment that
5928-749: The fixed assets of the railway network, including tracks, stations and signals. However, the national rail website domain is managed by The Rail Delivery Group on behalf of UK based train operating companies. According to their own website, they are a 'membership organisation that works on behalf of the rail industry to create a simpler, better railway for everyone in Britain.' The two generally coincide where passenger services are run. Most major Network Rail lines also carry freight traffic and some lines are freight only. There are some scheduled passenger services on privately managed, non-Network Rail lines, for example Chiltern Railways which runs on both Network Rail track and tracks owned by London Underground . Although
6032-506: The former York and North Midland Railway at Colton Junction, south-west of York. The old line between Selby and York was dismantled and is now a public cycleway. Mining subsidence discovered in 2001 also necessitated the realignment of 1.8 km (1.1 mi) of line at Dolphingstone in East Lothian , between Prestonpans and Wallyford stations. The new alignment takes the form of a gentle curve of up to 77 m (253 ft) towards
6136-434: The former British Rail Rail Alphabet lettering to varying degrees in station signage, although its use is no longer universal; however it remains compulsory (under Railway Group Standards) for safety signage in trackside areas and is still common (although not universal) on rolling stock. The British Rail typefaces of choice from 1965 were Helvetica and Univers , with others (particularly Frutiger ) coming into use during
6240-488: The full length of the line began on 8 July 1991, eight weeks later than scheduled. Significant traffic increases occurred in the two years after completion; one station recorded a 58 per cent increase in passengers. The programme also electrified the Edinburgh-Carstairs branch of the WCML, to allow InterCity 225 sets to access Glasgow Central , with the added benefit of creating an electrified path to/from Edinburgh on
6344-537: The full timetable is available as a pdf file without charge on the Network Rail website; however, passengers are recommended to obtain their timetables from the individual train companies. The National Rail website, previously called National Rail Enquiries, handles an average of 2.5 million journey planning enquiries every weekday through its website, apps and contact centre, and through information services supplied to third parties (such as open access data feeds). It
SECTION 60
#17328691991676448-508: The increased maximum speed, BR experimented in 1988 with using a fifth signalling aspect – flashing green – on the fast lines between Peterborough and Stoke Tunnel. The flashing green aspect appeared at signals preceding one displaying an ordinary steady green aspect, and authorised running at up to 140 mph. Upon encountering a steady green aspect the driver would reduce speed to no greater than 125 mph, and thus be ready to react to subsequent signals in
6552-412: The initial phases the services would have been heavy rail mostly along existing alignments with new additional infrastructure and rollingstock. The later phase would have introduced tram-trains to allow street running and further heavy rail extensions, and there was suggestions to have the metro extend west to Bishop Auckland from Darlington. Darlington was a major part of the scheme and so had some of
6656-527: The irreparably-damaged tunnel; ultimately the line was closed for five months and around 1,100 yards (1 km) of the original alignment had to be abandoned. In the late 1970s in the north of England, the development of the Selby Coalfield – and the anticipated subsidence that might result from its workings – led the National Coal Board to pay for the construction of
6760-447: The largest proposed improvements. To reduce the need for local services to cross the East Coast Main Line , two new eastern platforms would have been created. The new platforms would be connected to the main building by a new footbridge and lifts, and the existing car parking places that would have been lost with the new platforms would be replaced at a similar distance from the station. A new entrance, including pick-up/drop-off facilities,
6864-483: The later Class A4 , including 4468 Mallard . During this time Mallard set a new world-record speed for a steam locomotive (see § Speed records ). The East Coast Main Line was engaged in long running rivalry with the West Coast Main Line (WCML), the other main trunk route between London and Scotland. At various points in the late 19th century, highly publicised but unofficial races occurred between express trains on
6968-552: The latter of which achieved a world record speed for a steam locomotive, 126 mph (203 km/h) on the Grantham-to-Peterborough section. In 1948, the railways were nationalised and operated by British Railways . In the early 1960s, steam was replaced by diesel-electric traction , including the Deltics , and sections of the line were upgraded so that trains could run at speeds of up to 100 mph (160 km/h). With
7072-423: The length of the line. Included in the structure clearance works were the 127 overbridges that crossed the ECML. Where the existing bridge clearance was insufficient, project managers favoured wherever possible the rebuilding of the bridge rather than the lowering of the track, as the latter requires considerable civil works and can create long-term drainage problems. Where listed buildings were to be affected by
7176-604: The line passes over the Digswell Viaduct , Welwyn North station and the two Welwyn tunnels; and one between Fletton Junction (south of Peterborough) and Holme Junction, south of Holme Fen. The route between Holme Junction and Huntingdon is mostly triple track, with the exception of a southbound loop between Conington and Woodwalton. North of Grantham the line is double track except for quadruple-track sections at Retford , around Doncaster, between Colton Junction (south of York), Thirsk and Northallerton , and Newcastle. The line
7280-460: The line. In 1984, the decision was made to commence the electrification of the rest of the ECML to Edinburgh and Leeds. The Secretary of State for Transport Nicholas Ridley and Minister for Railways David Mitchell played a large role in the decision to proceed. Construction began on the second phase in 1985. In 1986 the section to Huntingdon was completed; Leeds was reached in 1988, then York in 1989 and Edinburgh in 1991. Electric services on
7384-537: The lineside signalling system on the southern ECML between London King's Cross and the Stoke Tunnel was commissioned in 1977 and as such was up for renewal between 2020 and 2029. Instead of renewing the current lineside signalling, it was decided to upgrade this section of the ECML to ERTMS in-cab signalling. This will not be the first instance of ERTMS on the UK rail network; it is in use on the Cambrian Line (where it
7488-404: The most relevant train company website, where they can buy their tickets without booking fees. In 2012 the website was joined by a mobile app mirroring its functionality. The app is available for iPhone , Android and Windows Phone . In June 2020, a real time personalised messaging service, Alert Me, was launched, providing real-time disruption and crowding information via Messenger. This
7592-415: The nation’s neglected railway industry". The NR title is sometimes described as a "brand". As it was used by British Rail, the single operator before franchising, its use also maintains continuity and public familiarity; and it avoids the need to replace signage. The lettering used in the National Rail logotype is a modified form of the typeface Sassoon Bold . Some train operating companies continue to use
7696-551: The opening of the GNR in 1850); and by NER locomotives between York and Edinburgh, using NER running powers over the NBR between Berwick and Edinburgh (agreed in 1862 but not exercised until 1869). The entire ECML came under control of the London and North Eastern Railway (LNER) in 1923, under the Railways Act 1921 which 'grouped' many small railway companies into four large ones . The LNER
7800-514: The operators. The Rail Delivery Group is the trade association representing the TOCs and provides core services, including the provision of the National Rail Enquiries service. It also runs Rail Settlement Plan , which formerly allocated ticket revenue to the various TOCs, and Rail Staff Travel, which manages travel facilities for railway staff. It does not compile the national timetable, which
7904-685: The passage of the Transport Act 1947 , and with effect from 1 January 1948 merged them into British Railways (BR). The ECML came under the control of three of BR's regions ; the Eastern Region , the North Eastern Region , and the Scottish Region (the former two were merged together in 1967). In the early 1960s, steam locomotives were replaced by diesel-electrics , amongst them the Deltic ,
8008-581: The programme, BR sought approval for its plans from the Royal Fine Art Commission . Through this process a special design of overhead wiring was developed for use on the visually-sensitive Royal Border Bridge , as well as the Croxdale and Durham City viaducts . Elsewhere the standard Mk. 3B equipment was deployed. The electrification was completed at a cost of £344.4 million (at 1983 prices, equivalent to £1169.3 million in 2023),
8112-657: The public sector through the government's operator of last resort procedure under the London North Eastern Railway brand. The route of the ECML has been altered or diverted several times, beginning with the opening of the King Edward VII Bridge in Newcastle upon Tyne in 1906. Later, the Penmanshiel tunnel collapse in the Scottish Borders in 1979 necessitated urgent works to divert the line around
8216-467: The record for a steam locomotive at 126 mph (203 km/h) whilst descending Stoke Bank on 3 July 1938. The record remains standing today, and a trackside sign was erected in July 1998 at the 90 + 1 ⁄ 4 milepost to commemorate the achievement. The world record for diesel-powered trains was set at 148 mph (238 km/h) on 1 November 1987, by a shortened InterCity 125 train of two Class 43 power cars and three coaches during
8320-433: The reopening of the former London Underground East London line and the extension to Barking Riverside . Eurostar is also not part of the National Rail network despite sharing of tracks and stations (along High Speed 1 ). Northern Ireland Railways were never part of British Rail, which was limited to England, Scotland and Wales. There are many privately owned or heritage railways in Great Britain which are not part of
8424-444: The same carbon commitment, which was referred to as 'The Green Travel Pledge' and was cited on its website and via Rail Delivery Group media. In June 2023 the website was completely overhauled with an entirely new frontend retaining little of the old designs but the brand logo remained. The website is quoted as saying its website is, "cleaner, more modern, and full of better information". In addition, its original mobile website which
8528-398: The same manner as when driving a lower-speed train. The testing found, however, that drivers couldn't be expected to consistently and accurately interpret and respond to lineside signals when driving at the higher speed, and regulations were later changed throughout Britain to require the use of in-cab signalling whenever running service trains at speeds above 125 mph. Nevertheless,
8632-402: The sectorisation period after 1983. TOCs may use what they like: examples include Futura ( Stagecoach Group ), Helvetica ( FirstGroup and National Express ), Frutiger ( Arriva Trains Wales ), Bliss ( CrossCountry ), and a modified version of Precious by London Midland . Several conurbations have their own metro or tram systems, most of which are not part of National Rail. These include
8736-510: The service is not busy, and 'anytime' tickets, which can be used on any train. Season tickets, which offer unlimited travel between two stations for a specified period, are also available. A 'rover' travel card ticket also exists that allows unlimited travel in a set area or on services of certain operators, for a certain period of time. Rovers which allow unlimited travel for only one day are sometimes referred to as ranger tickets, and are usually available for smaller areas. Passengers without
8840-498: The services of all operators on routes appropriate to the journey being made. Operators on some routes offer operator-specific tickets that are cheaper than the inter-available ones. Through tickets involving London Underground , or to some ferry services ( RailSail tickets) are also available. Oyster pay-as-you-go can be used on National Rail in Greater London from 2 January 2010. These same areas can also be journeyed to using
8944-410: The south, supported by concrete slabs and other ground stabilisation and reinforcement techniques, and is designed to avoid the need for a permanent speed restriction. It came into use in the last week of April 2003, at a cost of £56 million (equivalent to £92 million in 2023). World speed records for both steam and diesel traction have been set on the ECML. LNER's 4468 Mallard set
9048-662: The southern part of the ECML with 25 kV AC overhead lines from London King's Cross to Hitchin between 1976 and 1977. This was authorised in 1971 for the benefit of London suburban services as part of the Great Northern Suburban Electrification Project , using Mk. 3A equipment. The scheme electrified 70 route miles (110 km), including the Hertford Loop Line , part of the Cambridge Line from Hitchin to Royston , and incorporated
9152-515: The success of this scheme, in 1919 the North Eastern Railway, planned to electrify 80 miles (130 km) of the main line between York and Newcastle; the scheme progressed as far as a prototype locomotive , however it was cancelled on financial grounds after 1923 when the NER was grouped into the LNER, and the new management had no interest in pursuing the scheme. In the early-1930s, studies were conducted into electrifying sections or all of
9256-667: The town on 30 March 1841. A separate company, the Newcastle & Darlington Junction Railway continued the new main line northwards towards Ferryhill and Newcastle , opening its route three years later on 19 June 1844. This crossed the S&D at Parkgate Junction by means of a flat crossing which would in future years become something of an operational headache for the North Eastern Railway (NER) and London and North Eastern Railway (LNER). The original Bank Top station, where
9360-467: The two routes met, was a modest affair; it was rebuilt in 1860 to accommodate the expanding levels of traffic on the main line. By the mid-1880s, even this replacement structure was deemed inadequate and so the NER embarked on a major upgrade to facilities in the area. This included an ornate new station with an impressive three-span overall roof on the Bank Top site, new sidings and goods lines alongside it and
9464-417: The two routes, most notably in 1888 and 1895. These races were ended over concerns over safety, but later the rivalry resumed in the 1920s and 1930s as both the LNER and its West Coast competitor, the London, Midland and Scottish Railway (LMS), produced ever-more-powerful express locomotives. This reached its crescendo in the late 1930s, when the LNER introduced the famous streamlined Class A4 locomotives and
9568-512: The website. However, the website was quickly reverted back to its original design the same day following customer accessibility feedback. In July 2021 the Department of Transport published the world’s first ‘greenprint’ to decarbonise all modes of domestic transport by 2050 in the UK. It was published two months before the climate summit COP26, and planned to provide a world-leading ‘greenprint’ to cut emissions from 'seas and skies, roads and railways'. The nationalrail.co.uk website also signed up to
9672-549: The winners of a competitive tender process. The InterCity 225 sets were used alongside other rolling stock, including Class 90 locomotives and Class 317 electric multiple units. The displaced diesel trains were reallocated predominantly to the Midland Main Line . The infrastructure supported speeds of up to 140 mph, allowing a non-stop run of three hours and 29 minutes between London and Edinburgh on 26 September 1991. As part of testing done to support safe operation
9776-526: Was a sub-domain (m.nationalrail.co.uk now redirects) was switched off. Earlier in 2024 National Rail's digital journey planner was also switched off and redirected to the new version. Online Journey Planner (OJP) was the engine used to plan routes, calculate fares and establish ticket availability. The OJP accesses real-time information directly from Darwin, meaning all journey plans take account of delays, schedule changes and train cancellations. The OJP data feed APIs are available for use under licence. Darwin
9880-574: Was authorised to reach speeds up to 140mph completing the London to Edinburgh journey in 3 hours 29 minutes. In November 2021, as part of the Integrated Rail Plan , the DfT announced a major upgrade of the line. The upgrade is set to include major track improvements and digital signalling, leading to higher speeds, reduced journey times and increases in seat capacity. The power supply will also be upgraded to allow longer and more frequent trains. The last refresh of
9984-706: Was built during the 1840s by three railway companies, the North British Railway , the North Eastern Railway , and the Great Northern Railway . In 1923, the Railways Act 1921 led to their amalgamation to form the London and North Eastern Railway (LNER) and the line became its primary route. The LNER competed with the London, Midland and Scottish Railway (LMS) for long-distance passenger traffic between London and Scotland. The LNER's chief mechanical engineer Nigel Gresley designed iconic Pacific steam locomotives including Flying Scotsman and Mallard ,
10088-463: Was considered on the eastern side. Furthermore, release of track capacity on the ECML to allow more trains to run from Darlington to York and Newcastle and improved service to Saltburn (1–2 to 4 trains per hour) and new rollingstock were proposed. While unclear and never having concrete plans, street-running trams to Darlington town centre were also proposed in a future phase of the Metro. However, due to
10192-578: Was first piloted), on the Thameslink core Widened Lines route (with an ATO overlay), and on the Heathrow branch of the Great Western Main Line . However, it is the most complex application yet; never before in the UK has ERTMS been used on such a busy, mixed-traffic line, with freight , commuter , regional and InterCity services sharing as little as two tracks in the tightest sections. Unlike
10296-634: Was followed in September 2021 by a similar service made available through WhatsApp. The service was closed in June 2023 leaving only a simple SMS based messaging service in place for customers. Both services were provided by a British transport technology company Zipabout. In April 2021 the National Rail website turned from colour to greyscale in a tribute to The Prince Philip, Duke of Edinburgh who had died. The gesture however backfired after users highlighted accessibility issues and complained they could no longer use
10400-433: Was implemented until the 1970s and 1980s, with the entire line being electrified in two stages between 1976 and 1991. Early proposed schemes included a 1904 proposal by the Great Northern Railway to electrify its suburban services from London. A short stretch of the ECML in the Newcastle area was electrified with a third rail in 1904, as part of the North Eastern Railway 's suburban Tyneside Electrics scheme. Following
10504-741: Was introduced by ATOC in 1999, (previously British Rail logo as used from 1965), and was used on the Great Britain public timetable for the first time in the edition valid from 26 September in that year. Rules for its use are set out in the Corporate Identity Style Guidelines published by the Rail Delivery Group, available on its website. "In 1964 the Design Research Unit—Britain’s first multi-disciplinary design agency founded in 1943 by Misha Black, Milner Gray and Herbert Read—was commissioned to breathe new life into
10608-486: Was largely the preserve of the individual TOCs. However, railway reforms which are currently in progress will restore the pre-privatisation position, with design responsibilities for the whole network resting with the new 'guiding mind', Great British Railways. However, National Rail continues to use BR's famous double-arrow symbol , designed by Gerald Burney of the Design Research Unit . It has been incorporated in
10712-663: Was opened in 1906, replacing the older High Level Bridge as the main railway crossing of the River Tyne . Newark flat crossing , where the ECML crosses the Nottingham–Lincoln line on the same level just north of Newark Northgate station, is one of only two remaining flat crossings in Britain, the other being on the Cambrian Line where it intersections with the Welsh Highland Railway . Plans for grade separating
10816-477: Was the second largest railway company in Britain, its routes were located to the north and east of London. The LNER appointed Nigel Gresley (who was knighted in 1937) as its Chief Mechanical Engineer, and under his tenure, Pacific steam locomotives were developed as the standard express locomotive to work the line, several of which became famous, these included the Class A3 , including 4472 Flying Scotsman , and
#166833