Canadian Forces Morale and Welfare Services (CFMWS) ( French : Services de bien-être et moral des Forces canadiennes ; SBMFC ), previously known as Canadian Forces Personnel and Family Support Services (CFPFSS) and Canadian Forces Personnel Support Agency (CFPSA), is responsible for administering non-public property on behalf of the Chief of Defence Staff and delivering selected public morale and welfare programs, services, and activities.
49-595: CFMWS has over 5,500 staff on bases/wings/units and at headquarters in Ottawa. In partnership with bases , wings, and units, the Canadian Forces Regular Forces and Canadian Forces Primary Reserve members, retired and former members, military families, Department of National Defence employees, NPF employees, and Royal Canadian Mounted Police (RCMP) personnel, receive the morale and welfare programs, services, and activities needed. Prior to Unification of
98-722: A larger Canadian Forces base nearby. Note: Primary lodger units at Canadian Forces Bases used by the Canadian Army are regiments of the Canadian Army. Alberta : Manitoba : New Brunswick : Ontario : Quebec : Note: Primary lodger units at Canadian Forces Bases used by the Royal Canadian Navy are individual commissioned ships of the RCN. British Columbia : Nova Scotia : Newfoundland and Labrador Nunavut : Note: Primary lodger units at Canadian Forces Bases used by
147-589: A package which include the delivery of: The total cost of the HEP Phase II package was estimated by US Congressional Budget Office at US$ 862.3 Million. The total program cost for the CF-18 purchase and upgrade programs up until 2011 was approximately $ 11.5 billion (in 2011 dollars) including upgrades. Additionally, the cost of maintenance for any 20-year period has been approximately $ 5 billion, or $ 250 million per year. On March 8, 2024 Arcfield Canada
196-572: A proven off-the-shelf design and provide substantial industrial benefits as part of the order. By 1978, the New Fighter Aircraft competitors were short-listed to just three aircraft types: the F-16 and the two F-18 offerings. The F-14, F-15, and the Tornado were rejected due to their high purchase price, while Dassault dropped out of the competition. The F-18L combined the systems and twin-engine layout of
245-560: A steeply discounted price. Negotiations ended before a deal was reached as it was revealed that Canadian involvement was crucial in the smuggling of American embassy personnel out of the new Islamic Republic . In 1980, the McDonnell Douglas F/A-18 Hornet was declared the winner of the New Fighter Aircraft competition. The order included 98 single-seat variants and 40 dual-seat variants, for a total of 138 purchased, plus 20 options (which were not exercised). The F/A-18 Hornet
294-458: A system that collected biomedical data from the passenger in the back seat of the aircraft. The need to upgrade the CF-18 was demonstrated during the Gulf War deployment and during the 1998-1999 Kosovo conflict as advances in technology had rendered some of the avionics on board the CF-18 obsolete and incompatible with NATO allies. In 2000, CF-18 upgrades became possible when the government increased
343-826: Is a Royal Canadian Air Force (RCAF) variant of the American McDonnell Douglas F/A-18 Hornet fighter aircraft. In 1980, the F/A-18 was selected as the winner of the New Fighter Aircraft Project competition to replace CF-104 Starfighter , CF-101 Voodoo and the CF-116 Freedom Fighter . Deliveries of the CF-18 to the Canadian Armed Forces began in 1982. CF-18s have supported North American Aerospace Defense Command (NORAD) air sovereignty patrols and participated in combat during
392-432: Is focused on additional combat capability upgrades for 36 CF-188 aircraft, to ensure that sufficient, operationally relevant, mission-ready CF-188 fighters are available to meet air power capability requirements in the current battle space until the future fighter fleet reaches full operational capability". Initial delivery is expected in 2023 with full operational capability expected by June 2025. These upgrades were part of
441-638: The 2010 Winter Olympics and 2010 Winter Paralympics games. After a United Nations Security Council resolution was adopted to enforce a Libyan no-fly zone , the Government of Canada on 18 March 2011, authorized the deployment of six CF-18 Hornets with one Hornet in reserve as part of Operation Mobile . The Hornets were based at Trapani-Birgi Italian Air Force base in western Sicily . CF-18s were first put into combat on 23 March 2011 when four aircraft bombed Libyan government targets. The seven Hornets returned to CFB Bagotville , Canada, on 4 November 2011 after
490-641: The Boeing F/A-18E/F Super Hornet having been promoted as contenders by their manufacturers. According to Le Devoir , project costs without considering maintenance, training and spare parts, were estimated at $ 4 to $ 8 billion. Boeing indicated that the Super Hornet, a derivative of the Hornet, was a less expensive alternative at an estimated total cost of $ 4 billion. One of the manufacturers in contention, Boeing, BAE Systems or Saab Aerospace —the name
539-496: The Canadian Armed Forces . For a facility to qualify as a Canadian Forces base, it must station one or more major units (e.g., army regiments, navy ships, air force wings). Minor installations are named Canadian Forces station or CFS (French: station des Forces canadiennes, SFC ). A Canadian Forces station could host a single minor unit (e.g., an early-warning radar station). Many of these facilities are now decommissioned for administrative purposes and function as detachments of
SECTION 10
#1733085011177588-636: The Department of National Defence (DND) was not willing to bet on. The F-14 almost entered Canadian service through the backdoor due to the Iranian Revolution . In the aftermath of the revolution, the United States cut off all military supplies to Iran, which meant that the Iranians' new fleet of F-14s would potentially be rendered unflyable due to a lack of spares. The Canadians offered to purchase them at
637-774: The Grumman F-14 Tomcat , McDonnell Douglas F-15 Eagle , Panavia Tornado , Dassault Mirage F1 (later replaced by the Mirage 2000 ), plus the products of the American Lightweight Fighter (LWF) competition, the General Dynamics F-16 Fighting Falcon , the F/A-18 Hornet, and a de-navalized version of the Hornet, the Northrop F-18L . The government stressed that the winner of the competition be
686-660: The Gulf War in 1991, the Kosovo War in the late 1990s, and as part of the Canadian contribution to the international Libyan no-fly zone in 2011. CF-18s were also part of the Canadian contribution to the military intervention against ISIL , Operation Impact . A procurement process to replace the CF-18 with the Lockheed Martin F-35 Lightning II has been ongoing since 1997. In 1977, the Canadian government identified
735-562: The Royal Australian Air Force for approximately C$ 90 million. It was later announced in an Australian Senate hearing that Canada planned to purchase another seven Hornets to be disassembled for spare parts. The first two fighters arrived in February 2019, with the rest to be delivered over the next three years. "Total cost of the interim aircraft including modifications, inspections and changes to infrastructure and program costs
784-730: The Royal Canadian Air Force are wings of the RCAF. Alberta : British Columbia : Manitoba : Newfoundland and Labrador : Nova Scotia : Ontario : Quebec : Saskatchewan : The RCAF supplies aircraft to Canadian Joint Operations Command , which frequently operate from a chain of forward operating locations (FOLs) at various civilian airfields across northern Canada, capable of supporting RCAF operations. CF-18 Hornets , CP-140 Auroras and various transport and search and rescue aircraft periodically deploy to these FOLs for short training exercises, Arctic sovereignty patrols, aid to
833-618: The United States . A task group of CF-18s and CH-146 Griffons were deployed during "Operation Grizzly" to Kananaskis , Alberta in June 2002 where they were deployed to secure the airspace during the 28th G8 summit . In 2007, an unknown number of CF-18s were deployed to Alaska . They were deployed during two weeks to defend United States airspace as a result of the primary USAF F-15 fighter jet fleet being grounded due to structural defects. They were also deployed during "Operation Podium" to secure
882-568: The 100-hour Allied ground invasion in late February, CF-18s also flew 56 bombing sorties, mainly dropping 500 lb (230 kg) non-guided ("dumb") bombs on Iraqi artillery positions, supply dumps, and marshaling areas behind the lines. At the time the Canadian Hornets were unable to deploy precision guided munitions. This was the first time since the Korean War that the Canadian military had participated in combat operations. Continuing violence in
931-530: The 227 kg versions and two 910 kg versions. Canada sent six CF-18s to Iraq as part of Operation Impact on 21 October 2014. Air strikes on ISIS/ISIL positions began on 2 November 2014. The CF-18s flew air strike missions until 15 February 2016. Various fighter aircraft have been considered by the Canadian Forces as CF-18 replacements, with the Lockheed Martin F-35 Lightning II , Eurofighter Typhoon , Saab JAS 39 Gripen , Dassault Rafale , and
980-490: The 410 Operation Training Unit, No. 416 , and No. 441 Squadrons at Cold Lake, and 425 and 433 Escadrons (Squadrons) at CFB Bagotville , Quebec. Introduction into Canadian service was initially problematic due to early issues with structural fatigue which delayed initial deployment. As the initial bugs were worked out, the CF-18 started filling the NORAD interception and NATO roles as intended. In 1991, Canada committed 26 CF-18s to
1029-596: The 65 jets proposed by the previous government. He stated that if Canada is to meet its NATO and NORAD commitments while also maintaining its own national air defence, "then 65 jets would not be a full fleet. It would only be a fleet for risk managing our requirements, not meeting them." On 2 June 2017, it was announced that Canada would be acquiring 88 advanced multi-role fighters. As an interim measure pending replacement, Canada decided in December 2017 to purchase 18 F/A-18A/B Hornets (a mix of flyable airframes and spares) from
SECTION 20
#17330850111771078-691: The Canadian Arctic. There are normally a few aircraft at CFB Trenton , Ontario, as well, though not a permanent squadron. The RCAF also maintains a CF-18 Demonstration Team , a flight demonstration team which forms part of the 1 Canadian Air Division . Canada has lost at least twenty CF-18s in accidents, incurring at least eleven pilot deaths, as of November 2016. Data from CF-18 Technical Specifications General characteristics Performance Armament Avionics The documentary television show Jetstream , which aired on Discovery Channel Canada , followed eight pilots training with
1127-588: The Canadian Forces , virtually all Non-Public Property (NPP) activities were controlled and managed at the local level. In 1969, Treasury Board introduced the concept of delivering Morale and Welfare programs through a combination of Public and NPP resources. Immediately upon Unification in 1968, the Director General Personnel Services (DGPS) was created, reporting to the Chief of Personnel. DGPS
1176-564: The Canadian air force to fly the CF-18 at CFB Cold Lake . They trained at 410 Tactical Fighter Training Squadron. The CF-18 is used as a primary element of the new logo for the Winnipeg Jets NHL hockey team, as an homage to the city's connection to the RCAF /CF as well as an earlier Olympic gold medal-winning team, the Ottawa RCAF Flyers . The official unveiling described the origin of
1225-562: The F-14 and the F-15. The CF-18 was procured from 1982 to 1988, at a total capital cost of $ 4 billion in 1982 dollars. The original CF-18 as delivered is largely identical to the F/A-18A and B models. A total of 138 CF-18s, consisting of 98 single-seat and 40 dual-seat models, were delivered. Many features that made the F/A-18 suitable for naval carrier operations were retained by the Canadian Forces, such as
1274-554: The F-18 that Air Command favored with a lighter land-based equipment setup that significantly improved performance. Northrop, the primary contractor for the F-18L version, had not built the aircraft by the time of the NFA program, waiting on successful contracts before doing so. While Northrop offered the best industrial offset package, it would only "pay off" if other F-18L orders were forthcoming, something
1323-545: The Gulf War on Operation Friction . The CF-18s were based in Doha , Qatar. During the Gulf War, Canadian pilots flew more than 5,700 hours, including 2,700 combat air patrol missions. These aircraft were taken from Canada's airbase in Germany, CFB Baden-Soellingen . In the beginning the CF-18s began sweep-and-escort combat missions to support ground-attack strikes by Allied air forces. During
1372-556: The NATO strike sorties despite deploying a much smaller percentage of the overall forces. Canadian pilots flew 678 combat sorties: 120 defensive counter-air escorts for Allied strike packages and 558 bombing strikes during 2,577 combat flying hours. CF-18s dropped a total of 397 PGMs and 171 non-guided bombs on a wide variety of targets including surface-to-air missile sites, airfields, bridges and fuel storage areas. Since 2001, CF-18s have responded to nearly 3,000 possible threats to Canada and
1421-483: The Non-Public Property Board approved a second name change for the organization from CFPFSS to Canadian Forces Morale and Welfare Services. This name change aimed to strengthen the association of the name with the programs and services delivered by the organization. Canadian Forces Bases A Canadian Forces base or CFB (French: base des Forces canadiennes, BFC ) is a military installation of
1470-536: The civil power, or search and rescue operations. Northwest Territories Nunavut Ontario Quebec Yukon Alberta: British Columbia: Manitoba: New Brunswick: Nova Scotia: Ontario: Prince Edward Island: Quebec: Other: Alberta: British Columbia: Manitoba: New Brunswick: Nova Scotia: Newfoundland and Labrador: Northwest Territories: Nunavut: Ontario: Quebec: Saskatchewan: Yukon: CF-18 Hornet The McDonnell Douglas CF-18 Hornet (official military designation CF-188 )
1519-451: The contract was estimated to be worth C$ 9 billion, including aircraft and associated weapons, infrastructure, initial spares, training simulators, contingency funds and project operating costs. Media reports indicated that the lifetime cost of the aircraft might be as high as C$ 40 billion. In December 2012, it was announced that the government had abandoned the F-35 deal due to escalating cost, and
Canadian Forces Morale and Welfare Services - Misplaced Pages Continue
1568-629: The cost of implementation reimbursed by the Public to NPP. Effective April 21, 2008, the Non-Public Property Board approved a name change for the organization from the Canadian Forces Personnel Support Agency (CFPSA) to the Canadian Forces Personnel and Family Support Services (CFPFSS). CFPFSS was formed to consolidate personnel and family support across the Canadian Forces under a single organization. On April 15, 2013,
1617-550: The defence budget. In 2001, the Incremental Modernization Project (IMP) was initiated. The project was broken into two phases over a period of eight years and was designed to improve air-to-air and air-to-ground combat capabilities, upgrade sensors and the defensive suite, and replace the datalinks and communications systems on board the CF-18 from the old F/A-18A and F/A-18B standard to the current F/A-18C and D standard. Boeing (merged with McDonnell Douglas )
1666-542: The design involving the cooperation of the Department of National Defence and was inspired by the logo of the Royal Canadian Air Force. Team spokesman Dorian Morphy, Senior Director, Marketing & Brand Management of True North Sports & Entertainment indicated, "We are thrilled to be able to continue this relationship in a significant way. The design cues for the plane were inspired by the military jets flown by
1715-565: The end of the UN-approved NATO mission. In total, the Hornets conducted 946 sorties, making up 10% of NATO strike sorties. Over the course of their sorties, 696 bombs were dropped including Laser-guided bombs and Joint Direct Attack Munitions (JDAM). The RCAF has dropped 495 of the 227 kg versions (500 lbs) and 188 of the 910 kg versions (2,000 lbs) Paveway II bombs. The RCAF also dropped 11 Joint Direct Attack Munitions of
1764-445: The fighter's parity and interoperability with NATO and civil aviation standards to 2032. The package further expands compatibility support with the longer ranged AIM-120D AMRAAM air-to-air missiles initially acquired in 2017. It includes the following upgrades: Phase Il of the HEP applies to a fleet of 36 x CF-188A/B airframes with the estimated longest remaining life. Officially, "Phase 2
1813-520: The former Yugoslavia brought CF-18s into theatre twice: first for a deployment ( Operation Mirador ) during August–November 1997 for air patrols supporting NATO peacekeepers in Bosnia and Herzegovina, and again from late June 1998 until late December 2000 ( Operation Echo ). From March to June 1999, with 18 CF-18s already deployed to Aviano , Italy, Canada participated in both the air-to-ground and air-to-air roles. Canadian aircraft conducted 10 percent of
1862-658: The need to replace the NATO-assigned CF-104 Starfighter , the NORAD-assigned CF-101 Voodoo and the CF-116 Freedom Fighter (although the decision was later made to keep the CF-116). Subsequently, the government proceeded with the New Fighter Aircraft (NFA) competition, with a purchase budget of around C$ 2.4 billion to purchase 130–150 of the winner of the competition. Candidates included
1911-458: The primary contractor and L-3 Communications the primary subcontractor, was issued a contract for the modernization project starting in 2002. A total of 80 CF-18s, consisting of 62 single-seat and 18 dual-seat models were selected from the fleet for the upgrade program. The project is supposed to extend the life of the CF-18 until around 2017 to 2020. Within the same time frame, other non-IMP upgrades include: The first completed "Phase I" CF-18
1960-458: The robust landing gear, the arrestor hook , and wing folding mechanisms. The most visible difference between a CF-18 and a U.S. F-18 is the 0.6- megacandela night identification light. This spotlight is mounted in the gun loading door on the port side of the aircraft. Some CF-18s have the light temporarily removed, but the window is always in place. Also, the underside of the CF-18 features a painted "false canopy" . In 1994, engineers worked on
2009-485: Was awarded a CA$ 211.6 million (US$ 157.3 million) sustainment contract to support and maintain the CF-18's avionics weapons systems, supply parts and provide end-to-end supply chain services with the contract being effective on April 1, 2024. The first two CF-18s were formally handed over to 410 (Operational Training Unit) Squadron at CFB Cold Lake , Alberta on 25 October 1982. Further deliveries equipped 409, 439, and 421 Squadrons at Baden-Soellingen in then West Germany,
Canadian Forces Morale and Welfare Services - Misplaced Pages Continue
2058-525: Was beginning a new procurement process, with the F-35 still being considered. On 20 September 2015, Canadian Liberal Party leader Justin Trudeau promised to cancel the country's F-35 procurement if he were elected, instead replacing the CF-18 fleet with a less costly alternative, and argued that the F-35 was not needed. He was sworn in as Prime Minister on 4 November 2015. In May 2017, Defence Minister Harjit Sajjan announced that Canada would purchase more than
2107-618: Was delivered to the Canadian Forces on 20 August 2007, at a ceremony in Montreal. The total cost of the entire CF-18 Incremental Modernization Project and concurrent Hornet upgrades was expected to be around C$ 2.6 billion. The final upgraded aircraft was delivered in March 2010. Phase I of the Hornet Extension Project (HEP) applies to entire fleet of 94 CF-188A/Bs and started in 2020 with completion expected in 2023. This will prolong
2156-666: Was delivered to the Canadian Forces on time in May 2003. Final delivery of all "Phase I" CF-18s was done at a ceremony on 31 August 2006 at L-3 Communications in Mirabel, Quebec. Phase II of the CF-18 Incremental Modernization Project was awarded to Boeing on 22 February 2005. It consists of the following upgrades: Within the same time frame, other upgrades unrelated to the IMP phases include: The first completed "Phase II" CF-18
2205-562: Was estimated to be C$ 360 million." In 2021 the last RAAF fighter was delivered. On 28 March 2022, Canada announced that advanced negotiations with Lockheed Martin for 88 F-35s would begin. The F-35 is the top bid for the Future Fighter Capability Project while Saab 's proposal for the Gripen came in second. The Canadian government noted that the Gripen may be chosen if negotiations with Lockheed Martin stall. This decision
2254-544: Was not disclosed—had promised to assemble the entire aircraft in Canada. Boeing said that it was contemplating closing the F/A-18 production line due to lack of orders. In July 2010, Canada announced that the F-35 would replace the CF-18. Canada has been a partner in the Joint Strike Fighter program since 1997, and a Tier 3 partner since 2002. The Canadian Forces planned to buy 65 F-35s with deliveries starting in 2016;
2303-480: Was responsible for NPP operations and Publicly funded fitness training and sports programs. At the same time, most resale activities were consolidated under the newly created CANEX . In 1996, all elements of Public and NPP Morale and Welfare program delivery were consolidated under a single NPP organization, CFPSA. Specific Public Morale and Welfare programs were delivered through the NPP organization administered by CFPSA, with
2352-470: Was then dubbed the CF-188. Outside official military documents, the aircraft are referred to as CF-18 Hornets. Reasons for the selection listed by the Canadian Forces were many of its requested features were included for the U.S. Navy; two engines for reliability (considered essential for conducting Arctic sovereignty and over-the-water patrols), an excellent radar set, while being considerably more affordable than
2401-670: Was to ensure a reasonable price for the aircraft. If negotiations succeed and Canada agrees a contract with Lockheed Martin, deliveries should begin in 2026, with final delivery in 2032. The complete program cost, including sustainment and maintenance, is estimated to be up to C$ 19 billion. In December 2022, the Canadian government approved $ 7 billion to procure a first batch of 16 F-35As and related equipment and support. Rotations from Cold Lake occur from 4 Wing to CFB Comox , British Columbia, and from 3 Wing Bagotville to CFB Goose Bay and CFB Gander , Newfoundland and Labrador, CFB Greenwood , Nova Scotia, and various forward operating bases in