Misplaced Pages

Acholibur–Gulu–Olwiyo Road

Article snapshot taken from Wikipedia with creative commons attribution-sharealike license. Give it a read and then ask your questions in the chat. We can research this topic together.
#106893

4-508: The Acholibur–Gulu–Olwiyo Road is a road in the Northern Region of Uganda, connecting the town of Acholibur to the city of Gulu and the town of Olwiyo . The road starts at Acholibur, a small town on the Kitgum – Lira road, approximately 19 kilometres (12 mi) south of Kitgum. The road continues in a southwesterly direction to Gulu (2014 population: 152,276), the most populous city in

8-530: The Rwekunye–Apac–Aduku–Lira–Kitgum–Musingo Road , both in northern Uganda. The reports became available in 2013. On 21 February 2015, the upgrade from unsealed gravel surface to class II bitumen surface was commissioned by President Yoweri Museveni . The work on the 73 kilometres (45 mi) from Acholibur to Unyama is assigned to China Railway No.5 Engineering Group . The 70 kilometres (43 mi) road section from Unyama to Olwiyo

12-623: The Northern Region. The road then continues through Nwoya and Anaka to end at Olwiyo in Nwoya District , a distance of about 150 kilometres (93 mi). The road connects the districts of Kitgum , Pader , Gulu , and Nwoya. The coordinates of the road near Gulu are 2°48'24.0"N, 32°19'29.0"E (Latitude:2.806667; Longitude:32.324722). In 2009, the Ugandan government commissioned a feasibility study and detailed engineering design for this road and

16-467: Was upgraded by Jiangxi Zhongmei Engineering Construction Company Limited . Work was expected to last three years. The road project is fully funded by the Ugandan government. 02°57′03″N 32°16′17″E  /  2.95083°N 32.27139°E  / 2.95083; 32.27139 Northern Region, Uganda The Northern Region is one of four regions in Uganda . As of Uganda's 2014 census ,

#106893